Browse
Search
Agenda - 06-21-1999 - 8i
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1999
>
Agenda - 06-21-1999
>
Agenda - 06-21-1999 - 8i
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2009 2:35:04 PM
Creation date
3/18/2009 2:35:02 PM
Metadata
Fields
Template:
BOCC
Date
6/21/1999
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
8i
Document Relationships
1999 NS Housing - Jordan Construction Co and Taylor Home Improvements Housing Rehabilitation Contract Awards
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\1990's\1999
Minutes - 19990621
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11 <br />3 <br />Myrtle Riggsbee <br />116 Eugene St. <br />5/4/99 <br />ROOF: <br />1. Remove the existing shingle roof to the sheathing. Install <br />proper flashing between the two roofs. Install 151b. felt, aluminum <br />drip edge, three tab shingles and new plumbing boots. Install a shingle type <br />ridge ventilation system. <br />2. Install approximatelyl001.f. of 1x6 matching sheathing. <br />3. Install approximately 1601.f. of matching fascia. <br />EXTERIOR: <br />1. Pressure wash the exterior and deck. Prepaze all surfaces for paint. <br />Paint the block with flat exterior latex paint, the trim with semigloss <br />latex paint. <br />• 2. Install a crawl space access door of pressure treated plywood <br />on 2x4 framing. Install galvanized hinges and a locking hasp. <br />3. Install a 2x6 top rail, on the deck. Install an oil based <br />preservative and stain. <br />4. Install aluminum, continuous gutter and downspouts. <br />Install concrete splashblocks under each downspout. <br />5. Remove the existing ramp. Install proper framing and <br />pressure treated plywood. <br />6. Remove the existing reaz steps, Install steps of pressure <br />Treated lumber. <br />7. Install two sets of metal straps to join the addition to the old <br />structure. <br />INTERIOR: <br />
The URL can be used to link to this page
Your browser does not support the video tag.