Browse
Search
Agenda - 06-30-1999 - 9e
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1999
>
Agenda - 06-30-1999
>
Agenda - 06-30-1999 - 9e
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/15/2013 10:18:13 AM
Creation date
3/17/2009 3:00:01 PM
Metadata
Fields
Template:
BOCC
Date
6/30/1999
Meeting Type
Special Meeting
Document Type
Agenda
Agenda Item
9e
Document Relationships
Minutes - 19990630
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PHASING SCHEDULE <br />HILLSBOROUG H PLACE <br />PLANNED UNIT DEVELOPMENT <br />HILLSBOROUGH, NORTH CAROLINA <br />PREPARED BY: ELAM TODD d'AMBROSI,PA <br />260 NOTTINGHAM DRIVE <br />CARY,NORTH CAROLINA <br />YEAR 1 YEAR 2 YEAR 2 YIAR 4 YEAR 5 YEAR I YEAR 7 <br />TOTAL isms loss goal 2112 toes 2064 zoos <br />TRACT LANDYS! AClRAOE YMITSI6.F. UNITals.F. YNITR /S.F. 1101176 1B.F. YNIT• /s.F. UNITSIS.F. YNITSIS.F. YMITV IS.F. <br />A SINGLE - FAMILY 74.6 100 UNITS <br />20 <br />Farplamingpurposes HiWbmooph <br />60 <br />Place has been 6rbodulad for <br />development over the next Six yen, <br />6 <br />although It is reasonable to <br />anticipate that soma parcels, <br />paticdarly those in Phase six, may <br />B TOW NHOUSE/ 75.0 275 UNITS <br />PATIO HOMES <br />10 <br />10 <br />development timetable <br />26 <br />20 <br />established in two phase with a <br />26 <br />20 <br />number ofparcals going wider <br />2S <br />2• <br />construction at the stew time. It should <br />56 <br />26 <br />be noted that dovelopmot <br />may overlap Phasing ca eBones: all <br />/6 <br />2S <br />17 <br />C ASSISTED LIVING 10.6 100 UNITS <br />be completed in one phase before work <br />on the melt phase begins. <br />100 <br />PHASE I: <br />A strong demand is anticipated for <br />both single - family detached and <br />D RETIREMENT 10.0 s0 UNITS <br />M <br />housing, and a number of muti -G" <br />family housing units during the first <br />50 <br />fair yeah Also during phase one <br />20 <br />will be a atram& demand for Mkrcnt <br />type of con - residential uses as <br />shown in the phasing schedule. <br />a DAYCARE 6.S <br />Q '� <br />TU Second phase will also sea <br />cm11med building primarily m ret4 <br />1 <br />off, Wached, Cluster units and <br />single-hadly housing. It in anmClpated <br />that the Hill.bormgb Place Boulevard <br />will Completed. Sewer hunk lines and <br />F RETAIL 26.7 200,000 SO. FT. <br />oaosructed to serve Phase H <br />development parcels. <br />100000 <br />PHASING SCHEDULE 00 <br />60000 <br />60000 <br />a RETAIL 26.1 200,008 ta. FT. <br />60000 <br />60000 <br />100000 <br />M OFFICE 17.0 200,000 SO. FT. <br />100000 <br />100000 <br />1 APARTMENTS 26.0 500 UNITS <br />500 <br />J PUBLIC SAFETY STA. 5.0 <br />N OFFICE /FLE %SPACE 61.5 $00.000 So. FT <br />+/ <br />100000 <br />100000 <br />100000 <br />100000 <br />100000 <br />L APARTMENTS 25.9 500 UNITS <br />500 <br />N OFFICE 11.6 136.000 SO. FT. <br />1 50000 <br />60000 <br />56000 <br />N HOTEL 5.2 200 ROOMS <br />200 <br />PHASING <br />Farplamingpurposes HiWbmooph <br />Place has been 6rbodulad for <br />development over the next Six yen, <br />although It is reasonable to <br />anticipate that soma parcels, <br />paticdarly those in Phase six, may <br />undeveloped. The <br />development timetable <br />established in two phase with a <br />number ofparcals going wider <br />construction at the stew time. It should <br />I <br />be noted that dovelopmot <br />may overlap Phasing ca eBones: all <br />V1 <br />development may no necessarily <br />be completed in one phase before work <br />on the melt phase begins. <br />PHASE I: <br />A strong demand is anticipated for <br />both single - family detached and <br />stele- family attached umb, cluster <br />M <br />housing, and a number of muti -G" <br />family housing units during the first <br />fair yeah Also during phase one <br />will be a atram& demand for Mkrcnt <br />type of con - residential uses as <br />shown in the phasing schedule. <br />PRASE H: <br />Q '� <br />TU Second phase will also sea <br />cm11med building primarily m ret4 <br />off, Wached, Cluster units and <br />single-hadly housing. It in anmClpated <br />that the Hill.bormgb Place Boulevard <br />will Completed. Sewer hunk lines and <br />water distribution lime will be <br />oaosructed to serve Phase H <br />development parcels. <br />PHASING SCHEDULE 00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.