Browse
Search
Agenda - 06-30-1999 - 9d
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1999
>
Agenda - 06-30-1999
>
Agenda - 06-30-1999 - 9d
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/15/2013 10:18:36 AM
Creation date
3/17/2009 2:45:46 PM
Metadata
Fields
Template:
BOCC
Date
6/30/1999
Meeting Type
Special Meeting
Document Type
Agenda
Agenda Item
9d
Document Relationships
1999 NS Solid Waste Management Interlocal Agreement
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\1990's\1999
Minutes - 19990630
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORANGE COUNTY, NC <br />COST BREAKDOWN <br />CONSTRUCTABILITYNALUE REVIEW <br />Cost for Each Project Study <br />DIRECT LABOR <br />Hours <br />Rate <br />Labor Cost <br />Project Manager /CVS ** <br />96 <br />$95 <br />$9,120 <br />Structural Engineer <br />44 <br />$80 <br />$3,520 <br />Mechanical Engineer <br />44 <br />$85 <br />$3,740 <br />Electrical Engineer <br />44 <br />$85 <br />$3,740 <br />Architect <br />44 <br />$95 <br />$4,180 <br />Civil/Cost Engineer <br />44 <br />$80 <br />$3,520 <br />Senior Contractor /Construction Specialist <br />44 <br />$90 <br />$3,960 <br />Typist <br />48 <br />$45 <br />$2,160 <br />TOTAL DIRECT LABOR <br />408 <br />$33,940 <br />* *CVS Hours Breakdown <br />Prestudy arrangements/coor. with subs <br />8 <br />Project study /review <br />44 <br />Report writing/proofing — CVS #1 <br />28 <br />Report editing — CVS #2 <br />12 <br />Post report response /follow -up <br />4 <br />Total CVS Hours <br />96 <br />OTHER DIRECT COSTS <br />Cost/ <br />Unit <br />Uni <br />Cost <br />S <br />t <br />Meeting room rental — provided by County <br />-0- <br />-0- <br />Communication at study — provided by County <br />-0- <br />-0- <br />Ship study materials to CRT — number of copies <br />7 <br />$50 <br />$350 <br />Copy/bind CRT report — total number of reports, 10 to <br />11 <br />$50 <br />$550 <br />client, including shipping <br />Communication — allow <br />1 <br />$100 <br />$100 <br />In -house reproduction — number of copies <br />1,00 <br />$0.08 <br />$80 <br />0 <br />Travel <br />Round -trip — Washington, DC- Raleigh — <br />Airfare <br />Local Rental - days <br />Mileage: Norfolk to Chapel Hill <br />5 team members @ 500 miles each <br />Per Diem <br />6 team members x 5 days <br />Total Other Direct Costs <br />PROJECT COST SUMMARY <br />DIRECT LABOR <br />OTHER DIRECT COSTS <br />TOTAL PROJECT COSTS <br />1 $200 $200 <br />5 $60 $300 <br />2,500 $0.31 $775 <br />30 $100 $3,000 <br />$5,355 <br />$33,940 <br />$5,355 <br />$39,295 <br />E <br />
The URL can be used to link to this page
Your browser does not support the video tag.