Browse
Search
Agenda - 03-17-2009-13-3 Information Item 3
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2009
>
Agenda - 03-17-2009
>
Agenda - 03-17-2009-13-3 Information Item 3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2009 3:03:59 PM
Creation date
3/16/2009 3:03:59 PM
Metadata
Fields
Template:
BOCC
Date
3/17/2009
Meeting Type
Work Session
Document Type
Agenda
Agenda Item
Information Item 3
Document Relationships
Minutes - 20090317
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
publishes availability of the document and circulates to state/local agencies and public fora 30 day <br />review and comment period. After the 30 day period, SCH considers the comments received and <br />advises appropriate action (i.e., EA information is adequate; EA satisfies a finding of no significant <br />impact (FONSI); or an Environmental Impact Statement (EIS) is required). The County Planning <br />Department then considers the comments received from the SCH and documents its findings (i.e. a <br />FONSI or an EIS is required). The comment period for the Site 056 EA is from February 20 to <br />March 20, 2009. <br />Finalize scope of work for a flora and fauna survey and a Cultural and Archeological resources <br />survey for Site 056 in accordance with the County Cultural and Archeological Survey Policy for <br />Orange County Development Projects. Develop scope of survey for identification of wetlands, if <br />required. The surveys will be completed once the comments from the SCH have been received. <br />Complete property appraisal. <br />Landfill Contingency Plan <br />Investigation and evaluation of interim disposal options if landfill capacity is reached prior to completion of <br />a transfer station. <br />Activities com leted to date: <br />• Met with DENR to establish temporary transfer station permitting requirements. <br />• Developed costs for diversion of waste to private sector transfer stations. <br />Activities to be completed: <br />• Finalize temporary transfer station conceptual layout. <br />• Complete contingency plan report. <br />Citizens Advisory Board <br />Once a final transfer station site is selected begin establishment of citizens advisory board, including <br />inviting representatives from the three Towns to participate. <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.