Browse
Search
Agenda - 03-17-2009 - 4k
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2009
>
Agenda - 03-17-2009
>
Agenda - 03-17-2009 - 4k
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2016 4:08:39 PM
Creation date
3/16/2009 11:43:08 AM
Metadata
Fields
Template:
BOCC
Date
3/17/2009
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
4k
Document Relationships
Minutes - 20090317
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 <br /> 3. Membership Data: <br /> CHCCS total increase from the previous year: 199 students <br /> 129 Elementary School <br /> 75 Middle School <br /> (5) High School <br /> OCS total increase from the previous year: 12 students <br /> 7 Elementary School <br /> (36) Middle School <br /> 41 High School <br /> 4. Capacity Data: <br /> Two changes occurred in the CHCCS system with the opening of Morris Grove <br /> Elementary School and the implementation of the new class size ratio of 1:21 in grades <br /> K-3. Capacity at the Elementary level increased by 323. Two changes occurred in the <br /> OCS system as well. Capacity at the Elementary level decreased by 228 due to the <br /> implementation of the new 1:21 class size ratio for grades K-3 and capacity increased at <br /> the High School level by 25 with the completion of the new Partnership Academy <br /> Alternative School. <br /> 5. Capacity Issues <br /> SAPFO vs. DPI <br /> The SAPFO is a 'freestanding' ordinance, independent of State Department of Public <br /> Instruction (DPI) projections and rules regarding class size. The SAPFO, for instance, <br /> does not count temporary modular classrooms as fulfilling the capacity level of service <br /> outlined in the SAPFO interlocal Memorandum of Understanding (MOU). The MOU <br /> requires 'bricks and mortar' instead of temporary facilities and also requires its own set of <br /> future student projections to identify long-term capital school construction needs. <br /> With the opening of Morris Grove Elementary in August 2008, CHCCS does not exceed <br /> the adopted levels of service established in the SAPFO. OCS does not exceed the <br /> adopted levels of service. <br /> 6. Student Projection Analysis <br /> Student membership projections show an increase at all levels in both school systems, <br /> except the High School level for OCS, in years 2009-2011. The projections are shown on <br /> pages 36-37 of the report. <br /> 7. Orange County Schools Systems; CIP Needs Analysis <br /> CHCCS <br /> Projected needs: <br /> New Elementary#11 2010-2011 (projected overage of 26 students) <br /> New Elementary#12 2018-2019 (projected overage of 33 students) <br /> New Middle School #5 2013-2014 (projected overage of 20 students) <br /> Expanded High School 2016-2017 (projected overage of 104 students) <br />
The URL can be used to link to this page
Your browser does not support the video tag.