Orange County NC Website
Section I <br /> B. Building Capacity <br /> 1. Responsible Entity for Suggesting Change-The Planning Directors, School <br /> Representatives, Technical Advisory Committee (SAPFOTAC)will receive requested <br /> changes that are CIP related and adopted in the prior year. CIP capacity changes will be <br /> updated along with actual membership received in November of each year. - <br /> Other changes will be sent to a `Joint Action Committee' of the BOCC and Board of <br /> Education, as noted in the MOU, who will make recommendations and forward changes <br /> (on the specific forms with justification)to the full Board of County Commissioners for <br /> review and action. These non-CIP changes would be updated in the upcoming November <br /> CAPS system recalibration and included in the SAPFOTAC report. <br /> 2. Definition- 'Tor purposes of this Memorandum, "building capacity" will be determined <br /> by reference to State guidelines and the School District guidelines(consistent with CIP <br /> School Construction Guidelines/policies developed by the School District and the Board <br /> of County Commissioners) and will be determined by a joint action of the School Board <br /> and the Orange County Board of Commissioners. As used herein the term "building <br /> capacity" refers to permanent buildings. Mobile classrooms and other temporary student <br /> accommodating classroom spaces are not permanent buildings and may not be counted in <br /> determining the school districts building capacity." <br /> 3. Standard for: Standard for: <br /> Chapel Hill Carrboro School District Orange County School District <br /> The original certified capacity for each of the The original certified capacity for each of the - <br /> schools was certified by the respective schools was certified by the respective <br /> superintendent and incorporated in the superintendent and incorporated in the <br /> initialization of the CAPS system(Chapel Hill initialization of the CAPS system (Orange <br /> Carrboro School District April 29, 2002 - County School District April 30, 2002 -Base) <br /> Base) -.X=: -&. - <br /> Capacity changes were made each year as Capacity changes were made each year as <br /> follows: follows: <br /> 2 <br />