Orange County NC Website
M <br />3.Install a p -trap assembly, supply lines and cutoffs on the <br />vanity. <br />4. Install a washing machine plumbing box in the new addition. <br />Make all necessary waste and supply connections. <br />5. Install a frost free exterior faucet. <br />ME, CHANICAL: <br />1. Remove the existing duct work. Install insulated duct work. <br />INSULATION: <br />1. Install R -30 insulation in the attic. <br />2. Install R -19 insulation in under the floor. <br />3. Install a 6 mill vapor barrier in the crawl space. <br />Provide a termite and powder post beetle inspection and treatment. <br />ADDITION: <br />Addition to be 14x16 <br />Materials Shall Be: <br />Footer <br />8x8x16 cinderblocks <br />termite shield <br />2x8 pressure treated sills <br />anchor bolts <br />2x8 pine floor joists and band <br />1/2 inch subfloor <br />5/8 inch finish floor <br />2x4 framing <br />2, vinyl windows the same size as the existing windows <br />1/2 inch plywood sheathing <br />