Orange County NC Website
i <br />BATH: <br />1. Remove the bath ceiling. Install 1/s inch sheetrock. Tape <br />and finish the sheetrock smooth. <br />2. Remove the commode. Remove the floor covering to the <br />floor joists. Install 3/a inch AC plywood and 1/4 inch Juan <br />plywood. Prepare the floor for vinyl. <br />3. Install vinyl floor covering, metal trim and shoe mold. <br />Vinyl allowance to be $14 /yd. <br />4. Install a five piece accessory kit to include two towel <br />Bars, tumbler holder, soap dish and paper holder. <br />5. Install a surface mount medicine cabinet. <br />6. Paint the walls, trim and ceiling with semigloss latex <br />paint. <br />7. Reinstall the vanity and top. <br />ELECTRIC: <br />1. Install a 150 amp meter center, mast and weatherhead. <br />2. Install 2 additional outlets per room. <br />3. Install GFI outlets in the kitchen and bath. <br />4. Install new fixtures in each room and the exterior entrances. <br />5 Install a porcelin fixture in the crawl space and one in the attic. <br />6. Install a vent fan in the bath. <br />PLUMBING: <br />1. Install a handicap commode. Install new supply line and cutoff. <br />2. Install a seven inch, aluminum, double bowl sink with p -trap, <br />supply lines, cutoffs and washerless faucet. <br />