Orange County NC Website
b. Section III -D -lg and III -D -2d - Why is the effective period of a Concept Plan <br />doubled from 1 yeaf to 2 years? <br />c. Section III -D -2e - Three days is not enough time for the minutes of a Planning <br />Board meeting to be prepared and for the applicant to receive a letter from the <br />Planning Staff regarding the action of the Planning Board; <br />d. Section 3.5 - Why should it take longer than 3 days to enter an approved <br />amendment to the Zoning Atlas (with or without GIS)? <br />e. If the intent was to remove all time frames from the ordinances, at least one was <br />overlooked. <br />Thank you for your time and consideration. <br />Sincerely, <br />Emily C. Cameron, ASLA <br />200 Cobblestone Drive <br />Chapel Hill, NC 27516 <br />xc: John M. Link, Jr., County Manager <br />Geoffrey E. Gledhill, County Attorney <br />Craig Benedict, Planning Director <br />Karen Lincoln, Planner III <br />