Browse
Search
Agenda - 08-31-1999 - 3 Hillsborough Place
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1999
>
Agenda - 08-31-1999
>
Agenda - 08-31-1999 - 3 Hillsborough Place
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2009 11:16:08 AM
Creation date
3/12/2009 11:16:07 AM
Metadata
Fields
Template:
BOCC
Date
8/31/1999
Meeting Type
Work Session
Document Type
Agenda
Document Relationships
Minutes - 19990831
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORANGE COUNTY PLANNING DEPARTMENT <br />306F REVERE ROAD 2 <br />HILLSBOROUGH, NORTH CAROLINA 27278 <br />`,yyf} If E <br />s~ <br />Y~ <br />V 52 <br />yffi Gso~`• <br />MEMORANDUM <br />TO: John M. Link, Jr., County Manager <br />FROM: Craig Benedict, Planning Director <br />DATE: August 27, 1999 <br />SUBJECT: Hillsborough Place <br />Hillsborough Place has been renamed to Corbin Downs. The meeting of <br />September 8 has a draft agenda, which is Attachment 1. An analysis of the <br />development proposal is in process by both Hillsborough and Orange County <br />staffs. The proposal has been changed to decrease residential units and <br />increase non-residential square footage. An outline of the new development <br />scheme and phasing is Attachment 2. <br />The changes .proposed are under review but not fully because the applicant has <br />not submitted their reports on changes to the traffic impact. In any event, <br />Orange County staff will be commenting on the following topics to be more <br />elaborately analyzed for the actual joint agenda package to be distributed either° <br />Thursday, September 2 or Friday, September 3. <br />Traffic <br />Construction and extent of 4-laning Old 86, I-40 and I-85 intersections, limited <br />access along Old 86, Transit-Oriented Development (TOD). <br />Traffic Peripheral Issues <br />• The proposed Hillsborough Bypass should be constructed in a timely manner. <br />• Churton Street/Old 86 expansion should be accelerated to match <br />construction with this project. <br />• Consider future connectivity to a potential rail station north of this project. <br />School <br />See attachment 3 (under review with School District). <br />Building Plan Review and Inspection Services <br />Presently there is not enough building division staff to provide services of this <br />amount. Review fee structure to accommodate cost of services for this project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.