Orange County NC Website
n~~yy 15:05 CHATHAM CIIUNTY MANAGERS OFFICE -~ 9196443064 <br />Coasnlting Engneers <br />MEMORANDUM <br />TO: Chatham County <br />FROM: Hobbs, Upchurch & Associates, P.A. <br />N0.686 P002~004 <br />290 S W. Broad Street <br />Southern Pines, N. C. 283$7 <br />(910) 692-5616 <br />DATE: July 21,1999 <br />RE: Letter from Orange Couttry requesting an update on water supply from Jordan Lake <br />The following discpssion addreaQea issues raised in a July 15,19491etter front, the Orange County <br />Manager to Mr. Charlie Home. <br />a. Cheuha~ County's cttrnettt arrangement for obtaining Jordan Lake Waur throtegh the <br />CaryJAprx intake jacilitiss. Currently, Chatham County has a water purchase contract with <br />the Town of CarylApex that allows the County to purchase up to I.0 MGD of raw want <br />averaged over a month period The contract terms indicate that Chatham County's purchase <br />cannot exceed 1.0 MGD on a monthly average. TypicaAy, Chatham County experiences <br />seasonal demand increases in the North Chatham System and additional eapaetty is required <br />to meet the increased demand. The Iowa of Cary has provided some latitude for increacirig <br />the County's allowable raw water purchase as outlined in the water purchase contract, This <br />amount may increase in 100,000 gallon iacremerrts and must be requested in writing. <br />Chatham County has requested increases several times over the last few years, however, Cary <br />has declined to grant the County a perrnaneat increase. Cary has permitted the County to <br />temporarily increase its withdrawal by several hundred thousand gallons a day with the <br />stipulation that it can be reduced at any Gitne. <br />b. The probltms and shortcomings of that arrangrrereea ones oa ersaessmerit ojthe Sterte's <br />ability to e,~`ee:t a satisfactory solution to those probtitas. State and federal governtnent <br />organizations charged with Jordan Lake regulation and oversight have worloed under the <br />assumption that intakes on Jordan Lake will operate as regional facilities without any <br />centralized support or incentives. Tlu Corps of Engineer's Jordan Lake master plan was <br />designed assuming that there would be two regional intakes: The Jotdar- Lake allocation <br />process was designed and has been implemented assuming that allocation holders would be <br />able to access their allocation through regional facilities. Unforhmaoely, the existing <br />regulatory framework does not include any assistance to local governments wishing to <br />participate in a regional facility. The lack of any centralized oversight has resulted in a "first <br />cots, fast served" system that favors large financially secure utilities at the expense of <br />smaller less capital rich utilities. <br />Cary/Apex's intake facility was initially promoted as a regional intake in which Chatham <br />County would be a welcome participant, however, in the past few years, Cary. has expressed <br />an increasing reluctance to partnering with Chatham County, especially on a long term <br />permanent basis. The regulatory bodies and oversight bodies that promoted the intake as a <br />