Browse
Search
Agenda - 09-08-1999 - 1
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1999
>
Agenda - 09-08-1999
>
Agenda - 09-08-1999 - 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2009 4:38:36 PM
Creation date
3/10/2009 4:16:41 PM
Metadata
Fields
Template:
BOCC
Date
9/8/1999
Meeting Type
Municipalities
Document Type
Agenda
Document Relationships
Minutes - 19990908
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_ .. .. . <br />- -- <br />_....___ <br />i <br />ORANGE COUNTY PLANNING <br /> STAFF REPORT <br /> The below referenced topics are comments and issues that should be addressed during the <br /> feasibility, review and response stage to a proposed project the scale of Hillsborough Place <br /> (Corbin Downs). The impacts to the County occur in varying levels depending on the function <br /> and service provision of various departments within the County. The comments below are not <br /> intended to be alt inclusive but address general areas of impact and concern that should be <br /> further analyzed by the applicant and governmental jurisdictions. <br /> The following topics are included in this report <br /> - Traffic Impact <br /> - Transportation Improvements <br />. - <br />- School <br />Building Plan Review and Inspections Services <br /> - EMS <br />~ - <br />- Police <br />Fire <br /> - Parks and Recreation <br />t - <br />- Library <br />Erosion Control <br /> - Public Transit <br /> - Aging Services <br /> - Social Services <br /> - Health Services <br /> - Landfill Services _ <br /> - Phasing of Project <br /> - Economic Development <br />' ' - Tax Revenue ' <br /> 1. Traffic Impact -See O.C. Attachment 1 <br /> 2. Traffic Peripheral Issues <br /> e The proposed Hillsborough Bypass should be constructed in a timely manner. <br /> o Churton Street/Old 86/1-85 expansion should be accelerated to match construction <br /> with this project. <br /> • Consider future connectivity to a potential rail station north of this project. <br /> 3. School - (Direct County Services) <br /> • Orange County School district provides service to this area. The residential program <br />' should include an analysis of the student generation from the project and the impact <br /> on elementary, middle and high schools that serve the subject area. The annual <br /> impact based on the phasing should be considered as well as the housing product <br /> types and the higher student generation rates that could be associated with higher <br /> bedroom counts in the housing market. <br /> • An under/over school capacity analysis should be developed for this project. <br />Page 1 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.