Browse
Search
Agenda - 09-08-1999 - 1
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1999
>
Agenda - 09-08-1999
>
Agenda - 09-08-1999 - 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2009 4:38:36 PM
Creation date
3/10/2009 4:16:41 PM
Metadata
Fields
Template:
BOCC
Date
9/8/1999
Meeting Type
Municipalities
Document Type
Agenda
Document Relationships
Minutes - 19990908
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
from major capital issues. The iss oe oc att~ i ~g ~ d(~late °plant~ wastewaterCtreatment plant, and <br />on the utility system's three mad P reason: Ca ital facility fees can be <br />reservoir) was intentionally not specified for one primary P <br />adjusted (e.g., increased) to match the actual cost impact of serving new development with key <br />facilities, such as a water plant expansion project. If Corbin Downs is annexed, the Town will have <br />to conduct an analysis to re-establish accurate and fair rates for Capital Facility Fees to ensure that <br />all new development is paying its own way for utility service. <br /> <br />~~ <br />r~ <br /> <br /> <br />OPERATIONAL IMPACTS -GENERAL FUND ' <br />Governinv Body -Minimal impact. Increased costs for legal and audit fees will occur due to <br />increased expenditures/operations by the Town. Half of these costs are allocated in the forecast (via <br />an interfund service charge) to the Water/Sewer Fund, as is done in the budget. <br />Admin~ n - It is anticipated Corbnn DoFY01~This inegludes time demands placed on the Town <br />overall administrative operations start g <br />Clerk, Town Manager, and assistance to other departments in dealing with the expansion of services <br />to this area. This impact will likely necessitate hiring aManagement/Personnel Analyst to address <br />these needs in FY01. The lazgest impact in this department will be the additional insurance costs <br />associated with expanded departmental operations for both funds. Half of these costs are allocated <br />in the forecast to the Water/Sewer Fund. <br />Finance - Once Corbin Downs makes substantial progress on their development, it is estimated to <br />have a 40 hour per week impact on all Finance Department operations. The forecast projects the <br />need for afull-time accountant (or similaz).position to be added in FY03. Half of these costs are <br />allocated in the forecast to the Water/Sewer Fund. <br />Planning -The Planning Department currently provides zoning, planning, site review, code <br />enforcement, and fire inspections services. Once completed, Corbin Downs will likely double the <br />workload by the Town's Fire Inspector, who also currently functions as the Code Enforcement <br />Officer. He will have to vacate his duties as Code Enforcement Officer and be a full-time Fire <br />Inspector. This impact, along with the time demands placed on the Planning Director in revi act in <br />new development associated with the project, is anticipated to have a 20 hour per week imp <br />FY01 and approximately 30 hours per week from fiscal years 2002-2006. The impact will be <br />greatest on the Planning Department as Corbin Downs is yeing developed, the time demantldie F re <br />decrease once construction intensity declines and eventuall ceases. A portion of re lacing <br />Inspector's vehicle is allocated to the Corbin Downs cost in FY02. <br />Ruffi___~ n__Roulhac -Town HaCI -Minimal impact. Half of these costs are allocated in the forecast to the <br />Water/Sewer Fund. <br />Police Department -The majority °iclesstand the substation.ro A t to ofiten new police personnel <br />Downs relates to new personnel, veh atrol officers are <br />are needed to adequately provide proerada /7 dahis e e week presence by uniformed officers. In <br />necessary to maintain a 24 hour p Y Y P <br />addition, two Community Policing Officers are needed to supplement the other fiinctions in <br />providing their services, as well as establishing regular communications with the wide variety of <br />land uses included for Corbin Downs. One criminal investigator and one narcotics investigator will <br />2-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.