Browse
Search
Agenda - 09-14-1999 - 1
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1999
>
Agenda - 09-14-1999
>
Agenda - 09-14-1999 - 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/6/2009 12:26:25 PM
Creation date
3/10/2009 9:49:35 AM
Metadata
Fields
Template:
BOCC
Date
9/14/1999
Meeting Type
Work Session
Document Type
Agenda
Agenda Item
1
Document Relationships
Minutes - 19990914
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 5 <br />e- <br />Estimated Building Construction Costs <br />ESTIMATED BUII.DING CONSTRUCTION COSTS <br />UTILIZING ALL EXISTING SPACE <br />COMPARISON <br /> Renovate New Space Combined If All New <br /> Existing Space Requirements for 1995 Construction <br />Conrb 51,080,850 5168,910 S1,Z49,760 53,033,746 <br />Qa 550/595 <br />Law 5110,200 5147,600 SZ57,800 5878,378 <br />Enforcement <br />(03 520/590 <br />Jail 51,185,800 51,084,795 52,270,595 56,134,269 <br />~ 540/5115 <br />Other 5550,125 5328,400 S878,525 51,783,236 <br />(a3 545/580 - <br />Total for 52,926,975 51,729,705 54,656,680 511,829,629 <br />Co. Gov't <br />Potential Building Construction . 57,172,950 <br />Cost Savings <br />Orange County Justice Facilities Stady Committee <br />G r l e r- F rY p p Are L i t e e t ~ <br />Note: Renovation square foot prices do not include any major changes in the structural, <br />heating, ventilating, air conditioning, plumbing or electrical systems. <br />5-6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.