Orange County NC Website
INTRODUCTION <br />T., <br />Workplan A worlcplan and .agenda were developed for a series of .six <br />Committee meetings. A synopsis of each of these meetings and <br />pertinent data for discussion is included in the chapters that <br />follow. Major topics and meeting dates are summarized below; <br />SESSION ACTIVITY <br />ONE MI ION <br />(10/7/94) • Expectations <br /> • Barriers <br /> • Philosophical Direction re: <br /> Services <br /> Facilities <br />TWO SERVICE DELIVERY MODELS <br />(11/18/95) • Mission Objectives <br /> • Concept Modeling <br /> Centralized/De-centralized <br /> "Citizen Focused" <br /> Service Diversi <br />THREE SPACE SERVICE RELATIONSHIP <br />(1/2095) • Activity Service Priorities <br /> Existing Activities <br /> Desired Activities & Services <br /> • Location Issues <br />FOUR. SPACE REQUIREMENTS <br />(3/24/95) • Existing Space <br /> • Deficiencies <br /> • Future Requirements <br /> • Massin Illustrations <br />FIVE OPTIONS FOR DEVELOPMENT <br />(4/21/95) • Phased Concept Options <br /> • Construction Costs <br /> • Project Costs <br /> • Financin O tions <br />SIX THE VISION• "MAKING IT HAPPEN" <br />(6/16/95) • Proposed Concept <br /> • "Selling the Concept" <br /> Information/Communication <br /> Public Relations <br /> Public Perce tions <br />v <br />