Orange County NC Website
LIST OF EXHIBITS <br /> Pie Pat <br />Figure Table <br />1 Charge 1-3 1 Existing Space Inventory 4.4 <br />2 The Process 1.4 2 Projected Space Requirements 45 <br />3 Mission Statement 1-5 3 Projected Space Requirements 4~ <br />4 ~~~ 1-6 - AncillaryBus. Services <br />5 Barriers 1 _7 4 Projected Space R~uirements 5-5 <br />6 Expectations 1-8 5 Estimated Building 5-6 <br />7 "The Bridge" 1-9 Construction Costs 5-7 <br />8 Mission Statement 2-3 6 Estimated Building 5_7 <br />9 Traditional Concepts 2-5 . Construction Costs 5-8 <br />10 Conxxpt Modeling 2-6 7 Estimated Total Project 5-8 <br /> "Citizen Focused° Costs <br />11 Departmental Adjacenry 4-7 8 Departmental Location 5-15 <br /> Regwrements Preferences <br />12 .Land Area Reqmnts 4~ <br /> Single Level <br />13 Land Area Regmnts 4-9 <br /> Two Level <br />14 Land Area Regmnts 4-10 <br /> 'Three Level <br />15 Massing Illustrations 411 <br />16 Massing Illustrations ~ 412 <br />17 Massing Illustrations 4-13 <br />18 Massing Illustrations 4-14 <br />19 Agenda 5-4 <br />20 Phased Concept Options 5-9 <br />21 Phased Concept Options 5-10 <br />22 Financing Options 5-11 <br />23 Mission Statement 5-12 <br />24 Map 5-14 <br />25 Agenda g.4 <br />26 Mission Statement 6-5 <br />27 Concept g-7 <br />28 Map g~ <br />29 Financing 6-9 <br />30 Immediate Tasks 6-10 <br />31 Schedule for Action-Plan 6-11 <br />32 Selling the Vision 6-12 <br />33 Steering Group Form 6-15 <br />34 The Plan 6-16 <br />35 .Timing 6-17 <br />36 Public Perceptions 6-18 <br />37 Public Relations 6-19 <br /> i <br />