Browse
Search
Agenda - 09-14-1999 - 1
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1999
>
Agenda - 09-14-1999
>
Agenda - 09-14-1999 - 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/6/2009 12:26:25 PM
Creation date
3/10/2009 9:49:35 AM
Metadata
Fields
Template:
BOCC
Date
9/14/1999
Meeting Type
Work Session
Document Type
Agenda
Agenda Item
1
Document Relationships
Minutes - 19990914
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- - --- .~' <br /> <br />FINANCIAL IMPACT: Funds are included in the 1999-2009 Capital Investment Plan to cover the <br />$12,000 cost of preparing the master plan. <br />RECOMMENDATION(S): The Manager recommends that the Board endorse the measures proposed <br />in the attached report for enhancing security in the Hillsborough facility; and authorize the Chair to sign a <br />contract as negotiated by the Manager with Grier-Fripp Architects to include the following stipulations: <br />• Scope of work shall be: <br />• To develop an illustrated Facility Master Plan for future expansion of the existing courts <br />building in Hillsborough, with particular focus on how a security checkpoint could best be <br />integrated into the long-term development of the facility. <br />• The study area shall extend between the existing court facility to the Government <br />Services Center. <br />• The master plan shall include multi-level additions, parking, circulation <br />(pedestriaNvehicular) and building points of access/egress. <br />• The Master Plan shall include a Phasing Plan, based on the projected needs for <br />Hillsborough court facilities as cited in the 1995 Justice Facility Study Group report, as <br />revalidated by the 1998 committee. <br />• Cost shall not exceed $12,000 (funds are available in the 1999-2009 Capital Investment <br />Plan); <br />• Report shall be completed and presented for Board consideration by the end of the calendar <br />year. <br />
The URL can be used to link to this page
Your browser does not support the video tag.