Browse
Search
Agenda - 09-14-1999 - 1
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1999
>
Agenda - 09-14-1999
>
Agenda - 09-14-1999 - 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/6/2009 12:26:25 PM
Creation date
3/10/2009 9:49:35 AM
Metadata
Fields
Template:
BOCC
Date
9/14/1999
Meeting Type
Work Session
Document Type
Agenda
Agenda Item
1
Document Relationships
Minutes - 19990914
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHAPTER 7 -SUMMARY AND RECOMMENDATIONS <br />If the optional plan is to complete all construction by the <br />yeaz 2000 such that the facility is large enough to meet the <br />space requirements up to the yeaz 2020, the total estimated <br />project cost would be $51,961,230. This option would <br />require only one construction period and a single financing <br />effort as compazed to a multiphased construction plan <br />requiring multiple financing efforts. <br />RECOMMENDATIONS The following recommendations were made by the Justice <br />Facilities Study Committee in order of priority; <br />• Work together with the Orange County Commissioners <br />to either adopt or modify the recommended action plan <br />of this Committee. <br />• Finalize Schedule for Action Plan. <br />• Coordinate with the Orange County Capital <br />Improvements Program for establishing a funding <br />timeline. <br />• Create a Steering Committee <br />Identify Members and Their Roles <br />Prepaze for Consensus Building <br />Create a "Game Plan" <br />• Contract for Needs Assessment <br />Inmate projections <br />Evaluate existing building systems <br />• Contract for Definitive Program Document <br />• Contract for Site Selection <br />Create a Site Selection. Committee <br />• Contract for Schematic Design <br />Based on specific site, needs assessment and <br />program documents <br />• .Implement "Selling the Concept" <br />Public Information Meeting <br />Multi-Media and Event Exposure <br />• Obtain financing through bonds or other financing <br />mechanisms identified in this report. <br />7-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.