Browse
Search
Agenda - 09-14-1999 - 1
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1999
>
Agenda - 09-14-1999
>
Agenda - 09-14-1999 - 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/6/2009 12:26:25 PM
Creation date
3/10/2009 9:49:35 AM
Metadata
Fields
Template:
BOCC
Date
9/14/1999
Meeting Type
Work Session
Document Type
Agenda
Agenda Item
1
Document Relationships
Minutes - 19990914
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHAPTER 7 -SUMMARY AND RECOMMENDATIONS <br />SUMMARY To use a process that outlines a vision and develops a <br />mission statement for long range planning is a unique <br />opportunity for Orange County. The Justice Facilities Study <br />Committee has set the course for sound and efficient <br />planning to meet the future judicial and related agency <br />service needs for the benefit of its citizens. <br />Key to this effort has been the diverse representation of the <br />membership comprising the Justice Facilities Study <br />Committee. Each committee member represents one of the <br />county government agencies addressed in this planning <br />process. Each brought to the discussions his or her <br />department's perspective of future needs necessary to deliver <br />effective and efficient services to .the citizens of Orange <br />County. <br />Mission and Master It is envisioned that the mission statement developed will <br />Plan serve as the measure for ,all subsequent discussions for <br />planning focused on meeting the needs of the existing and. <br />future requirements of the Judicial system. The master plan <br />for the overall implementation of the projected phased <br />construction plan responds to the mission statement, <br />identifies current and future needs of the respective <br />departments, is "citizen focused" in design and meets the <br />strategic, geographic and demographic needs of the public. <br />Concept Location The facilities that will. house the Judicial and related <br />services will be in two locations. The Primary Facility will <br />be located in Hillsborough to take advantage of the capital <br />investment in existing facilities and the opportunity afforded <br />by available land strategically located between the New <br />Courthouse and the Government Services Center. There is <br />sufficient. land to accommodate the projected facility needs <br />through the yeaz 2020 including the required pazking. This <br />concept assumes the continued reuse of the Old Courthouse <br />and existing jail on the opposite sides of Mazgaret Lane. <br />The Primary Facility will be a multi-level structure with an <br />accompanying pazking structure located off of Margazet <br />Lane. It will be connected to and between the New <br />Courthouse on Churtin Street and the New Government <br />Services Center. Here there is the opportunity to combine <br />existing facilities of judicial, law enforcement, detention and <br />related services for "one stop shopping" at a central <br />7-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.