Orange County NC Website
- - - Figure 30 <br />~. _, <br />:; <br /> <br />Immediate Tasks: <br />"Defining the Steps" <br />Based on the project budget, the method of financing will be <br />determined using one or a combination of options as described in <br />Figure 22, p.b-11. Then; <br />• Coordinate with the Orange County Capital <br />Improvements Program (CIP) for establishing <br />a funding availability projection. <br />Finalize Schedule for Action Plan <br />• Create a Steering Committee <br />- Identify Members and Their Roles <br />- Prepare for Consensus Building <br />- Create a Game Plan <br />® Contract for Needs Assessment <br />- Inmate projections <br />- Evaluate existing building systems <br />® Contract for Definitive Program Document <br />® Contract for Site Selection <br />- Create a Site Selection Committee <br />® Contract for Schematic Design <br />-Based on specific site, -needs assessment <br />and program documents <br />• Implement "Selling the Concept" <br />Orange County Justice Facilities Study Committee <br />G r i e r- F r i p p A r c h i t e c t s <br />6-10 <br />