Browse
Search
Minutes - 19730712
OrangeCountyNC
>
Board of County Commissioners
>
Minutes - Approved
>
1970's
>
1973
>
Minutes - 19730712
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2014 3:58:17 PM
Creation date
8/13/2008 12:10:16 PM
Metadata
Fields
Template:
BOCC
Date
7/12/1973
Document Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
W. <br />BOOR $ r„~~ 6~ <br />CHAPEL HILL-CARRBORO CITY SCHOOLS <br />~. CURRENT EXPENSE eUOGET REQUEST <br />1973-1974 <br />The current expense budget request for the Ghapel Hi11-Carrboro City Schools <br />reflects four basic areas: <br />Continuation of Current Programs and Services for 1973-74 <br />~' Cost Ad3ustments Resulting from Actions of the General Assembly <br />Cost Adfustments Resulting from the Reduction of Federal Programs <br />New or Expanded Programs Needed in the School System <br />1. Continuation of Present Programs and Services: $1,327.272.66. This <br />represents an increase of $21.212.66. The increase is caused by normal <br />"step" increases in the salary schedule for ciassified employees and in <br />rate increases for utilities and fuel. <br />2. Cost Adfustments Resulting from Actions of the General ~.ssembly; <br />$44,345.60. <br />The General Assembly increased teachers salaries by 5% and extended the <br />period of employment to Len mm~ths. The Chapel Hi11-Carrboro City Schools <br />pnploy 45 teachers paid entirety from local Funds. To meet the new state <br />) salary schedule for these teachers will require $986.00 per position for <br />a fetal of S44,345.60. <br />3. Cost Adjustment Resulting from the Reduction of Federal Programs: <br />$90,896.85. <br />The school system has been advised to expect a reduction in ESE;, Title I <br />funds in tho amcunt of approximately $40,000.00. these funds have been <br />used to operate four kindergarten sections. A second federal pr:grrm in <br />which a loss of funds is anticipated is Headstart in the amount of 5'0,000. <br />These funds have been used to operate two kingergarten Sections. Headstart <br />guidelines cannot legally be met by the Board of Education. <br />These Pour kindergarten sections have been serving educationally and <br />economically disadvantaged pupils. These children need all thn help pos- <br />sable in preparation for school and the enntinuatien of these kindergarten <br />sections is, therefore, Considered imperative. It wi11 be several more <br />years before state supported kindergarten sections will be available in <br />sufficient numbers to meet this need. The minumum funds necessrry to meat <br />this need after all possible costs have been absorbed by the school system <br />is 556,000.00. <br />The school system has been operating a high school program in occupational <br />education for handicapped pupils. Because of the reduction of federal <br />funds for occupational education, this program, costing 535,000.00, must <br />either be discontinued or paid for from local funds. Without this prcgram, <br />these mentally and physically handicapped young people would neither be <br />abic to profit fmm high school nor have an opportunity to develop salab]e <br />skills which help them become economically self-sufficient. <br />Page 2 <br />4. New and Expanded Programs: 5237.146.23. <br />The Board of Education has Spent the past year in identifying prograr <br />needs of the school System. Parents, students, teachers, school staff, <br />and the community at large have participated in this process. The new <br />programs proposed in this budget represent the minimum program imprnv~- <br />ments expected of the school system by the community, Chief arrong these <br />are the following: <br />Introduction of a career exploration program in the 3unier <br />high school grades. <br />~ - Provisicn of some released time for elementary teachers (one <br />hour per week) by the provision of special art and music <br />_ I teachers, <br />it A five percent increase in salary and the provision of annual <br />Teave for classified employees who are employed during the <br />~ school year. <br />Continued modest improvements in the amount of funds for <br />instructional supplies, field trips, furniture replacement, <br />sports programs, summer school, and maintenance services. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.