Orange County NC Website
7. A connection from Highway 70 east to the Interstate connector should <br /> remain a priority when submitting projects to NCDOT for consideration. <br /> Please note that the above list is not a complete list of all of the - <br /> recommendations contained in the E#land-Mebane SAP, but serves as a guide to <br /> the most significant actions that must occur before subsequent actions can be <br /> pursued. <br /> • <br /> NC Highway 57 Speedway Area Small Area Plan (Highway 57 SAP) <br /> The BOCC adopted the Highway 57 SAP on August 27, 2007. Implementation of <br /> the plan will require actions as follows: <br /> 1. Adopt the Highway 57 SAP as part of the Comprehensive Plan. <br /> 2. Revise the Land Use Element map to include the Highway 57 SAP Study <br /> Area. <br /> • 3. Adopt Conditional Use zoning text amendments,with the Rural Economic <br /> Development Area component_ <br /> 4, Consider developer-initiated zoning atlas amendments within the Highway <br /> 57 SAP Study Area at a later date. <br /> Eno EU D Area Smelt Area Plan <br /> The BOCC adopted the Eno EDD Area SAP on June 24, 2008. The successful <br /> implementation of this small area plan is dependant upon an interlacal <br /> Agreement with the City of Durham to provide water and sewer services to this <br /> area. Implementation of the plan will require actions as follows: <br /> 1, Adopt the Eno EDD Area SAP as part of the Comprehensive Plan. <br /> 2. Negotiate an Interlocal Agreement with the City of Durham-to provide water <br /> and sewer services to the area. <br /> 3. Revise the Land Use Element map to reflect the Proposed Future Land Use <br /> Map contained in the SAP and revise the Land Use Element text to include <br /> the new land use category. <br /> 4. Incorporate necessary text changes into the Zoning Ordinance to implement <br /> the revised Land Use Element. <br /> Please note that the above list is not a complete list of all of the <br /> recommendations contained in the Eno EDD Area SAP, but serves as a guide to <br /> the most significant actions that must occur before subsequent actions can be <br /> pursued. <br />