Browse
Search
Agenda - 02-23-2009 - C1
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2009
>
Agenda - 02-23-2009
>
Agenda - 02-23-2009 - C1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2016 10:58:09 AM
Creation date
2/18/2009 3:00:50 PM
Metadata
Fields
Template:
BOCC
Date
2/23/2009
Meeting Type
Public Hearing
Document Type
Agenda
Agenda Item
C1
Document Relationships
Minutes - 20090223
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
50 <br /> ii. Openings to facilitate equalization of hydrostatic flood forces on <br /> walls according to Section 6.32.2(5),when solid foundation <br /> perimeter walls are used in Zones; <br /> e) Usage details of any enclosed space below the regulatory flood <br /> protection elevation. <br /> f) Plans and/or details for the protection of public utilities and facilities <br /> such as sewer, gas, electrical, and water systems to be located and <br /> constructed to minimize flood damage; <br /> g) Copy of all other Local, State and Federal permits required prior to <br /> floodplain development permit issuance (i.e. Wetlands, Erosion and <br /> Sedimentation Control,Riparian Buffers, Mining, etc.) <br /> h) If the Floodplain Administrator issues a floodplain development permit <br /> for placement of recreational vehicles and/or temporary structures, <br /> documentation to ensure compliance with Section 6.32.2(5 and 7) of <br /> this Ordinance. <br /> i) If a watercourse is proposed to be altered and/or relocated, a description <br /> of the extent of watercourse alteration or relocation, an engineering <br /> report on the effects of the proposed project on the flood-carrying <br /> capacity of the watercourse and the effects to properties located both <br /> upstream and downstream; and a map, drawn to scale, (if not shown on <br /> plot plan) showing the location of the proposed watercourse alteration <br /> or relocation. <br /> 14.6.2. Floodplain Development Permit Data Requirement. The following <br /> information shall be provided at a minimum on the floodplain development <br /> permit to ensure compliance with this Ordinance. <br /> a. A description of the development under the floodplain development <br /> permit issuance. <br /> b. The SFHA determination for the proposed development per available <br /> data specified in Section 4.2.38. <br /> c. The regulatory flood protection elevation required for the reference <br /> level and all attendant utilities. <br /> d. The regulatory flood protection elevation required for the protection of <br /> all public utilities. <br /> e. All certification submittal requirements with timelines. <br /> f. A statement that no fill material shall encroach into the floodway or <br /> non-encroachment area of any watercourse, if applicable. <br />
The URL can be used to link to this page
Your browser does not support the video tag.