Orange County NC Website
CHAPEL HILL-CARRBORO CITY SCHOOLS <br /> CAPITAL PROJECT LIST <br /> Amount Facility Project Description <br /> 31,980,730 Elementary School #11 The School District needs another elementary school <br /> 27,738,770 Carrboro High School Expansion of Carrboro High School <br /> 2,500,000 Rashkis Elementary School 6 Classroom addition <br /> 2,500,000 Morris Grove Elementary School 6 Classroom addition <br /> 200,000 Phillips MS/FPGraham Elm Removal of asbestos fascia material <br /> 420,000 CHHS/Phillips Removal of asbestos floor tile <br /> 350,000 CHHS Athletic field lighting and correct erosion problems <br /> 225,000 Glenwood/McDougle/Seawell Security systems: access control video cameras <br /> Culbreth/Phillips <br /> 370,000 Elementary Schools Removal of classroom carpet and install vinyl tile <br /> 1,035,000 FP Graham/Ephesus/Seawell/ Light fixture replacements <br /> Culbreth/Phillips <br /> 475,000 Glenwood/FP Graham/Culbreth Kitchen air conditioning and heating systems <br /> 265,000 Scroggs Chiller installation <br /> 650,000 Lincoln Center Replacement of building heating and cooling systems <br /> 375,000 Culbreth Duct work replacement and controls <br /> 440,000 CHHS D Building heating system <br /> 350,000 McDougle Mdl/Elm/Glenwood Controls for heating and cooling system <br /> 275,000 Seawell Replacement of Lawlor Building's roof <br /> 690,000 Lincoln Center Replacement of roof <br /> 3,854,840 McDougle Elementary and Middle Replacement of roofs <br /> 1,256,000 LinCtr/Seawell/Culbreth/Phillips/ Window replacements <br /> CHHS <br /> 233,000 FP Graham/Estes Hills/Phillips/ Bathroom upgrades <br /> CHHS <br /> 739,000 Carrboro Elm/Estes/FP Graham Classroom casework <br /> Seawell/Phillips/CHHS <br />