Browse
Search
Agenda - 02-17-2009 - 4l
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2009
>
Agenda - 02-17-2009
>
Agenda - 02-17-2009 - 4l
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2016 4:31:12 PM
Creation date
2/16/2009 4:20:56 PM
Metadata
Fields
Template:
BOCC
Date
2/17/2009
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
4l
Document Relationships
2009-004 Solid Waste - UNC - Landfill Gas Agreement
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2009
Minutes - 20090217
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2009
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
265
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
west of the Highway 86 exit from Interstate 40, and approximately five (5) miles north of Chapel <br /> Hill, at 1514 Eubanks Road, Chapel Hill, North Carolina, which consists of two land disposal <br /> areas,a"North"closed unit comprising about fifty(50)acres(the"North Landfill"),and a"South" <br /> operating unit comprising approximately twenty-five (25) acres and operated in four phases (the <br /> "South Landfill"). The South Landfill is currently operating in Phase 4 and is expected to reach <br /> capacity in the Spring of 2011; <br /> WHEREAS,waste acceptance records indicate that the North Landfill received about 1.2 <br /> million tons of waste during its operating period from 1972 to June 1995. The capacity of the <br /> South Landfill is approximately 920,000 tons; <br /> WHEREAS, Landfill Gas (as defined below), consisting principally of methane, carbon <br /> dioxide, nitrogen and traces of other constituent gases, is generated as a by-product of the <br /> decomposition of waste in the Landfill; <br /> WHEREAS, subject to the terms and conditions set forth in this Agreement, the County <br /> desires to grant to the University the exclusive right to design,develop,install and operate the LFG <br /> Project(as defined below)to process the Landfill Gas (and in particular,methane) and <br /> to convert LFG into one or more forms of energy, thereby reducing associated greenhouse gas <br /> emissions from the Landfill, while at the same time generating power from a renewable energy <br /> source; <br /> WHEREAS, subject to the terms and conditions set forth in this Agreement, the <br /> University desires to have the exclusive right to design, develop, install, and operate the LFG <br /> Project, and to collect, extract, and remove LFG from the Landfill, and either to destroy such gas <br /> or to convert all or any portion of it into energy to supply part of the University's energy needs at <br /> its Carolina North Campus, or for any other lawful purpose; and <br /> 4 <br /> (00018638.DOC 24-24} <br />
The URL can be used to link to this page
Your browser does not support the video tag.