Browse
Search
Agenda - 02-17-2009 - 4l
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2009
>
Agenda - 02-17-2009
>
Agenda - 02-17-2009 - 4l
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2016 4:31:12 PM
Creation date
2/16/2009 4:20:56 PM
Metadata
Fields
Template:
BOCC
Date
2/17/2009
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
4l
Document Relationships
2009-004 Solid Waste - UNC - Landfill Gas Agreement
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2009
Minutes - 20090217
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2009
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
265
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
assignments of rights, and other documents as may be necessary to allow the University to <br /> perform its obligations under this Agreement. <br /> 76. The County shall make available to the University copies of all environmental <br /> information, reports, studies, landfill gas feasibility reports, assessments or other documents <br /> affecting the generation of Landfill Gas or the LFG Project that the County has prepared or that <br /> have been prepared on the County's behalf. Such documents include those the County is <br /> required to submit to the North Carolina Department of Environment and Natural Resources. <br /> 77. The County shall reasonably ensure that the County, its employees and <br /> contractors do not damage the LFG Project or disrupt the operation of the system. Should such <br /> damage occur, the University has the right to take immediate action to effectuate whatever <br /> repairs are necessary to bring the LFG Project into fully operational condition and the County <br /> shall timely reimburse the University for the reasonable costs of repair. <br /> 78. The County shall retain the sole and exclusive right, and shall have all obligations <br /> with regard to, Landfill operations and for meeting all applicable Laws pertaining to such <br /> operation, exclusive of the University's operation of the LFG Project. <br /> D. Operating Protocols <br /> 79. The Parties agree to develop and implement operating protocols for the LFG <br /> Collection System, including, without limitation, monitoring and reporting procedures, <br /> communications and emergency response plans, and notification procedures. <br /> ARTICLE III <br /> PERMITTING AND CONSTRUCTION OF FACILITIES <br /> 80. The installation and construction of the LFG Project shall be the sole <br /> responsibility and be undertaken at the sole expense of the University, and shall be carried out in <br /> 20 <br /> {00018638.DOC 24} <br />
The URL can be used to link to this page
Your browser does not support the video tag.