Browse
Search
Agenda - 02-17-2009 - 4l
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2009
>
Agenda - 02-17-2009
>
Agenda - 02-17-2009 - 4l
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2016 4:31:12 PM
Creation date
2/16/2009 4:20:56 PM
Metadata
Fields
Template:
BOCC
Date
2/17/2009
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
4l
Document Relationships
2009-004 Solid Waste - UNC - Landfill Gas Agreement
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2009
Minutes - 20090217
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2009
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
265
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
fifteen (15) calendar days to complete the final review and approval of such revised plans and <br /> specifications prepared by the University. Any revised plans and specifications for which the <br /> County has not provided a response within fifteen(15) calendar days shall be deemed approved. <br /> Should subsequent changes or modifications be made to the-plans and specifications after they <br /> have been approved, the County shall then have seven (7) calendar days to review and approve <br /> such changes or modifications. Any subsequently revised plans and specifications for which the <br /> County has not provided a response within seven (7) calendar days shall be deemed approved. <br /> Within a reasonable time after completing construction of the LFG Collection System, but no <br /> longer than sixty (60) calendar days, the University shall provide to the County all "as-built" <br /> plans and specifications for the LFG Collection System. Until the "as-built" plans and <br /> specifications for the LFG Collection System are provided to the County, the University shall <br /> keep the County informed as to the state of the construction of the LFG Collection System and <br /> the location of all then-installed components of such system. <br /> 64. The University, its employees, agents and subcontractors shall minimize <br /> disruption to Landfill operations during construction, operation, and maintenance of the LFG <br /> Project. During the Term of this Agreement, the University, its employees, agents and <br /> subcontractors shall not unreasonably interfere with the County's operation of the Landfill, <br /> including, but not limited to, the County's closure of portions of the Landfill and any other <br /> requirements under the Landfill Permits or applicable Laws, and shall reasonably ensure that the <br /> Landfill is not damaged by the University. Should such damage occur, the University shall <br /> arrange for the repairs itself; provided, however, that the County has the right to take immediate <br /> action to effectuate whatever repairs are necessary to the Landfill and the University shall timely <br /> reimburse the County for the reasonable costs of any such repairs. The University shall use its <br /> 16 <br /> (00018638.DOC 24) <br />
The URL can be used to link to this page
Your browser does not support the video tag.