Orange County NC Website
System, as <br /> event that LFG generated by the Landfill exceeds the capacity of the Gas Conversion S y <br /> determined by the University in accordance with good engineering practices and industry <br /> standards; (iii) during Gas Conversion System maintenance, repair, or associated downtime; (iv) <br /> as reasonably necessary to protect human health, safety, or the environment; and (v) during the <br /> pendency of a Force Majeure event affecting the Gas Conversion System. <br /> 56. The University shall have the right to use and access portions of the Landfill and <br /> such other property depicted on Exhibit C to carry out the development, construction, and <br /> operation of the LFG Project, including any activities necessary to evaluate the feasibility of the <br /> LFG Project, or the design and permitting of the LFG Project. The County agrees to make <br /> commercially reasonable efforts to assist the University, whenever feasible, in accessing any <br /> parcel of property not owned solely by the County that is necessary for the construction and <br /> operation of the LFG Project, including the Greene Tract. <br /> 57. The County shall grant the University, without additional University payment <br /> beyond the compensation set forth in this Agreement, such easements and rights of way through <br /> the Landfill site and other property owned solely by the County as may be necessary to drill gas <br /> extraction wells, lay pipelines, lateral lines, header lines, and any other part of the LFG Project <br /> infrastructure as contemplated by this Agreement, including, without limitation, the easements <br /> and rights of away set forth on Exhibit C. The County also grants the University, without <br /> additional University payment beyond the compensation set forth in this Agreement, licenses or <br /> other approvals to install utility lines on the Landfill and other property owned solely by the <br /> County for the LFG Project. The Parties agree that in the event the County is unable to grant the <br /> easements and rights of way set forth on Exhibit C or otherwise breaches any of its duties or <br /> obligations under this Paragraph 57, (i) the University's sole and exclusive remedy shall be the <br /> 13 <br /> {00018638.DOC 24) <br />