Orange County NC Website
b. The receipt of all necessary LFG Project Permits relating to the Gas Conversion <br /> System and the Pipeline. <br /> Within ten(10) days of its receipt of the last Approval necessary to construct the Gas Conversion <br /> System and the Pipeline, the Party receiving such Approval shall notify the other Party in <br /> accordance with Paragraph 153 hereunder of the date of the issuance of such Approval. <br /> 131. Conversion Payment Dates The University shall commence Conversion <br /> Payments to the County thirty (30) days after the acceptance of the completed Gas Conversion <br /> System by the North Carolina State Construction Office. <br /> ARTICLE IX <br /> LANDFILL GAS DELIVERY <br /> 132. Ownership and title of the Landfill Gas shall pass to the University at the Delivery <br /> Point. <br /> 133. For purposes of measuring the quantity of Landfill Gas delivered to the Delivery <br /> Point,the University shall install,at its own cost and expense,Gas Flow Meters for Meter Point A <br /> and Meter Point B with a design accuracy of not less than two percent (2%) for all parameters <br /> measured and taking into account verification methodologies for Environmental Benefits. <br /> 134. Such Gas Flow Meters shall be owned, operated, maintained and calibrated by the <br /> University at its sole cost and expense. The Gas Flow Meters shall be designed and operated to <br /> provide time-synchronized data for MMBtu and to provide all other information required to be <br /> measured pursuant to this Agreement. The University's Gas Flow Meters shall be sealed,with the <br /> seals broken only for the purpose of inspecting, testing, repairing, or recalibrating the metering <br /> devices. The University shall keep its Gas Flow Meters accurate and in good working order and <br /> the University shall periodically test such metering equipment as the University deems necessary; <br /> 43 <br /> {00018638.DOC 2424) <br />