Orange County NC Website
76. The County shall make available to the University copies of all environmental <br /> information, reports, studies, landfill gas feasibility reports, assessments or other documents <br /> affecting the generation of Landfill Gas or the LFG Project that the County has prepared or that <br /> have been prepared on the County's behalf. Such documents include those the County is required <br /> to submit to the North Carolina Department of Environment and Natural Resources. <br /> 77. The County shall reasonably ensure that the County, its employees and contractors <br /> do not damage the LFG Project or disrupt the operation of the system. Should such damage occur, <br /> the University has the right to take immediate action to effectuate whatever repairs are necessary to <br /> bring the LFG Project into fully operational condition and the County shall timely reimburse the <br /> University for the reasonable costs of repair. <br /> 78. The County shall retain the sole and exclusive right, and shall have all obligations <br /> with regard to Landfill operations and for meeting; all applicable Laws pertaining to such <br /> operation, exclusive of the University's operation of the LFG Project. <br /> D. Operating Protocols <br /> 79. The Parties agree to develop and implement operating protocols for the LFG <br /> Collection System, including, without limitation, monitoring and reporting procedures, <br /> communications and emergency response plans, and notification procedures. <br /> ARTICLE III <br /> PERMITTING AND CONSTRUCTION OF FACILITIES <br /> 80. The installation and construction of the LFG Project shall be the sole responsibility <br /> and be undertaken at the sole expense of the University, and shall be carried out in compliance <br /> with the LFG Project Permits and all applicable Laws and in accordance with good engineering <br /> practices and industry standards. <br /> 20 <br /> (00018638.DOC 24-24) <br />