Orange County NC Website
Agreement in accordance with Article VI hereunder, and (ii) the University shall have no <br /> obligation to construct or complete the construction of the Pipeline or the Gas Conversion System, <br /> notwithstanding any terms to the contrary in this Agreement. <br /> 58. In furtherance of the LFG Project,the County hereby grants to the University, and <br /> its employees, contractors and agents, a non-exclusive license (the "License") for the following <br /> purposes, provided that any employees, contractors, and agents shall comply with the health and <br /> safety plan required to be developed under Paragraph 67 hereunder: <br /> a. the right to drill, excavate, trench or otherwise disturb the Landfill <br /> Propertyproperty for the purpose of installing,constructing,operating,maintaining <br /> and replacing gas wells, underground pipelines, tanks, Landfill Gas flaring <br /> mechanisms, and associated Landfill Gas equipment. <br /> b. the right to travel over any access roads located on the Landfill Propertyproperty <br /> and any adjacent property owned by the County,as such roads may be relocated by <br /> the County from time to time during the term of this Agreement, for the purpose of <br /> entry upon the Landfill ro ert . The University acknowledges that it <br /> does not claim any ownership interest in the Landfill Prep r ert , except as <br /> otherwise stated herein, because of the University's use of the Landfill <br /> Prepertyproperty. <br /> B. University's Operating Responsibility <br /> 59. Subject to Article VIII of this Agreement and except as otherwise provided herein, <br /> the University shall operate the LFG Collection System and the Gas Conversion System at all <br /> times during the Term of this Agreement. <br /> 60. The operation, maintenance, and repair of the LFG Project shall be the sole <br /> responsibility and undertaken at the sole cost and expense of the University (and its contractors <br /> 14 <br /> {00018638.DOC 21-241 <br />