Browse
Search
Agenda - 02-03-2009 - 6b
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2009
>
Agenda - 02-03-2009
>
Agenda - 02-03-2009 - 6b
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2016 10:50:10 AM
Creation date
1/30/2009 3:34:02 PM
Metadata
Fields
Template:
BOCC
Date
2/3/2009
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
6b
Document Relationships
Minutes - 20090203
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9 <br /> miles to the west of the Highway 86 exit from Interstate 40, and approximately five (5) miles <br /> north of Chapel Hill, at 1514 Eubanks Road, Chapel Hill,North Carolina, which consists of two <br /> land disposal areas, a "North" closed unit comprising about fifty (50) acres (the "North <br /> Landfill"), and a "South" operating unit comprising approximately twenty-five (25) acres and <br /> operated in four phases (the "South Landfill"). The South Landfill is currently operating in <br /> Phase 4 and is expected to reach capacity in the Spring of 2011; <br /> WHEREAS, waste acceptance records indicate that the North Landfill received about <br /> 12 million tons of waste during its operating period._.¢,'•m 1` 2 to June 1995. The capacity of <br /> the South Landfill is approximately 920,000 to' .n <br /> WHEREAS, Landfill Gas (as defined below), co principally of methane, carbon <br /> dioxide, nitrogen and traces of other constituent gases, is n i - a as a by-product of the <br /> decomposition of waste in the Landfill; <br /> WHEREAS, sub; wE terms and conditions set forth in this Agreement, the County <br /> desires to grant to 'versity exclusive right to design, develop, install and operate the <br /> LFG Project (as defined to ,dfill gas (and in particular, methane) and to <br /> convert LFG into one or more ' F of energy, thereby reducing associated greenhouse gas <br /> emissions from the Landfill, while a i e same time generating power from a renewable energy <br /> source; <br /> WHEREAS, subject to the terms and conditions set forth in this Agreement, the <br /> University desires to have the exclusive right to design, develop, install, and operate the LFG <br /> Project, and to collect,extract, and remove LFG from the Landfill,and either to destroy such gas <br /> or to convert all or any portion of it into energy to supply part of the University's energy needs at <br /> its Carolina North Campus,or for any other lawful purpose; and <br /> 4 <br /> (00018638.DOC 21) <br />
The URL can be used to link to this page
Your browser does not support the video tag.