Browse
Search
Agenda - 02-03-2009 - 6b
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2009
>
Agenda - 02-03-2009
>
Agenda - 02-03-2009 - 6b
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2016 10:50:10 AM
Creation date
1/30/2009 3:34:02 PM
Metadata
Fields
Template:
BOCC
Date
2/3/2009
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
6b
Document Relationships
Minutes - 20090203
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
85 <br /> commercially reasonable steps to promptly suspend the LFG operations pending the correction of <br /> the conditions causing such adverse effects. <br /> .62. 63,The University shall make commercially reasonable efforts to cooperate with <br /> the County in the preparation,execution,and filing of any applications or other documents as may <br /> be necessary to perform the County's obligations under this Agreement. <br /> 6.3 64-The University shall submit for the County's prior approval(which shall not be <br /> unreasonably withheld), all permit documentation prepared in accordance with Paragraph g2 <br /> and all construction and design plans and specifications relating to the construction,operation,and <br /> maintenance of the LFG Collection System prior to commencing construction. The County shall <br /> have fifteen (15) calendar days to complete its review and approval of any such plans and <br /> specifications. Any plans and specifications for which the County has not provided a response <br /> within fifteen(i 5)calendar days shall be deemed approved. Should the County provide comments <br /> on the initial submission of any submitted plans and specifications, it shall then have fifteen(15) <br /> calendar days to complete the final review and approval of such revised plans and specifications <br /> prepared by the University. Any revised plans and specifications for which the County has not <br /> provided a response within fifteen (15) calendar days shall be deemed approved. Should <br /> subsequent changes or modifications be made to the-plans and specifications after they have been <br /> approved, the County shall then have seven (7) days to review and approve such changes or <br /> modifications. Any subsequently revised plans and specifications for which the County has not <br /> provided a response within seven (7) days shall be deemed approved. Within a reasonable time <br /> after completing construction of the LFG Collection System, but no longer than sixty (60) days, <br /> the University shall provide to the County all "as-built" plans and specifications for the LFG <br /> Collection System. Until the"as-built"plans and specifications for the LFG Collection System are <br /> {00022477.DOC} <br />
The URL can be used to link to this page
Your browser does not support the video tag.