Browse
Search
Agenda - 02-03-2009 - 6b
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2009
>
Agenda - 02-03-2009
>
Agenda - 02-03-2009 - 6b
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2016 10:50:10 AM
Creation date
1/30/2009 3:34:02 PM
Metadata
Fields
Template:
BOCC
Date
2/3/2009
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
6b
Document Relationships
Minutes - 20090203
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
84 <br /> • b. the right to travel over any access roads located on the Landfill Property and any <br /> adjacent property owned by the County, as such roads may be relocated by the <br /> County from time to time during the term of this Agreement, for the purpose of <br /> entry upon the Landfill Property. The University acknowledges that it does not <br /> claim any ownership interest in the Landfill Property, except as otherwise stated <br /> herein,because of the University's use of the Landfill Property. <br /> B. University's Operating Responsibility <br /> 5 Subject to Article VIII of this Agreement and except as otherwise provided <br /> herein,the University shall operate the LFG Collection System and the Gas Conversion System at <br /> all times during the Term of this Agreement. <br /> 5t The operation, maintenance, and repair of the LFG Project shall be the sole <br /> responsibility and undertaken at the sole cost and expense of the University (and its contractors <br /> • and agents)and shall be performed by the University,its employees,agents and subcontractors(i) <br /> in compliance with all LFG Project Permits and applicable Laws and(ii)in accordance with good <br /> engineering practices and industry standards. The University assumes the risk of the delivery <br /> conditions (including the rate of flow, vacuum and pressure of delivery), quantity and quality of <br /> LFG. <br /> The University is solely responsible for creating sufficient vacuum to extract <br /> LFG from Landfill and transfer it to the Delivery Point. Any such vacuum shall not adversely <br /> affect the County's Landfill operations, and the University shall adjust its operations of the LFG <br /> Project or install necessary equipment at its sole cost and expense to correct any such adverse <br /> effect. Should such adverse effects arise that the University is unable to correct through <br /> operational adjustments, the University shall, at the County Manager's written request, take <br /> (00022477.DOC} <br />
The URL can be used to link to this page
Your browser does not support the video tag.