Browse
Search
Agenda - 02-03-2009 - 6b
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2009
>
Agenda - 02-03-2009
>
Agenda - 02-03-2009 - 6b
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2016 10:50:10 AM
Creation date
1/30/2009 3:34:02 PM
Metadata
Fields
Template:
BOCC
Date
2/3/2009
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
6b
Document Relationships
Minutes - 20090203
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
82 <br /> permitting, development construction, and operation of the LFG Project; (ii) the collection, <br /> extraction,and removal of the Landfill Gas;(iii)the production of electrical or thermal energy,and <br /> (iv)the redirection,redelivery,transport or marketing of the Landfill Gas, or any portion thereof; <br /> to any third party. Provided,however,that the County expressly retains all rights hi the Landfill <br /> Gas necessary to operate the Landfill in accordance with the Landfill Permits and all applicable <br /> Laws. <br /> The University agrees to flare any Landfill Gas delivered to the Delivery Point <br /> that is not transported by the University to.the Gas Conversion System as follows: (i) during the <br /> period occurring after the Flare Start-up Date and before the Engine Start-up Date;(ii)in the event <br /> that LFG generated by the Landfill exceeds the capacity of the Gas Conversion System, as <br /> determined by the University in accordance with good engineering practices and industry <br /> standards; (iii) during Gas Conversion System maintenance, repair, or associated downtime; (iv) <br /> as reasonably necessary to protect human health, safety, or the environment; and (v) during the <br /> pendency of aforce majeure event affecting the Gas Conversion System. <br /> 56. 57. The University shall have the right to use and access portions of the Landfill <br /> and such other property depicted on Exhibit C to carry out the development, construction, and <br /> operation of the LFG Project, including any activities necessary to evaluate the feasibility of the <br /> LFG Project, or the design and permitting of the LFG Project. The County agrees to make <br /> commercially reasonable efforts to assist the University, whenever feasible, in accessing any <br /> parcel of property not owned solely by the County that is necessary for the construction and <br /> operation of the LFG Project, including the Greene Tract. <br /> 57. &-The County shall grant the University, without additional University payment <br /> beyond the compensation set forth in this Agreement, such easements and rights of way through <br /> {00022477.DOC} <br />
The URL can be used to link to this page
Your browser does not support the video tag.