Browse
Search
Agenda - 02-03-2009 - 6b
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2009
>
Agenda - 02-03-2009
>
Agenda - 02-03-2009 - 6b
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2016 10:50:10 AM
Creation date
1/30/2009 3:34:02 PM
Metadata
Fields
Template:
BOCC
Date
2/3/2009
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
6b
Document Relationships
Minutes - 20090203
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
80 <br /> 32- 40:--LFG Collection System shall mean all equipment at the Landfill, including <br /> piping,header lines,lateral lines,wells,pumps,blowers,condensate knock-out vessels,flare,and <br /> related equipment used by the University to extract, collect, and treat Landfill Gas from the <br /> Landfill. <br /> 4I—LFG Project shall mean the LFG Collection System, the Gas Conversion <br /> System,and the Pipeline. <br /> 42-LFG Project Permits means all licenses,permits,certifications,authorizations, <br /> approvals, easements and entitlements issued by any Governmental Authority (including the <br /> County) and relating to the ownership, development, construction, installation, operation, <br /> maintenance and/or repair of the LFG Project, including, without limitation, any special use <br /> permits or special use permit modifications, as all of the foregoing may, from time to time <br /> hereafter,be amended or supplemented. <br /> 42. 43- Meter Point A shall be located on the header line that branches to the Gas <br /> Conversion System as shown on Exhibit B. Meter Point A shall be the point where the heating <br /> energy content of Landfill Gas delivered to the Gas Conversion System is measured. <br /> 43 44—Meter Point A Methane Content has the meaning set forth in Paragraph <br /> -14-97118. <br /> 44: 45:-Meter Point B shall be located on the header line that branches to the flare as <br /> shown on Exhibit B. Meter Point B shall be the point where the heating energy content of <br /> Landfill Gas delivered to the flare is measured. <br /> 45. 46-Meter Point B Methane Content has the meaning set forth in Paragraph <br /> X115. <br /> 47-MMBtn means one million(1,000,000)BTUs. <br /> (00022477_DOC) <br />
The URL can be used to link to this page
Your browser does not support the video tag.