Orange County NC Website
49 <br /> 134. Such Gas Flow Meters shall be owned, operated,maintained and calibrated by the <br /> University at its sole cost and expense. The Gas Flow Meters shall be designed and operated to <br /> provide time-synchronized data. for MMBtu and to provide all other information required to be <br /> measured pursuant to this Agreement. The University's Gas Flow Meters shall be sealed, with <br /> the seals broken only for the purpose of inspecting, testing, repairing, or recalibrating the <br /> metering devices. The University shall keep its Gas Flow Meters accurate and in good working <br /> order and the University shall periodically test such metering equipment as the University deems <br /> necessary; provided that the University shall test its tp -ring° equipment at least once every six <br /> (6) months, but in no case less than any testing 8 �� ,r',lent se ..,s rth in any applicable Laws or <br /> manufacturers' recommendations. In the event a Gas E ;< Meters is to be tested, cleaned, <br /> repaired or recalibrated, or otherwise read or inspected by th ver ity, the University shall <br /> provide the County with five (5) days prior written notice of . such procedure, so that the <br /> County may be present a such procedure. The University shall preserve all charts, test <br /> data and similar r. s . 4 accor.'a; e with the record retention provisions of Paragraph 148 of <br /> this Agreement. The Co 1: - it to install and maintain its own Gas Flow <br /> Meters. <br /> 135. The County and its , 1;`s is shall have the right from time to time, at reasonable <br /> times during the Term, to monitor, access, and inspect the condition and use of the LFG Project <br /> and to monitor, access, and inspect work in progress and the day-to-day operation of the LFG <br /> Project. Any such monitoring, examinations, inspections or visits shall be conducted in a <br /> manner so as to cause minimum interference with the University's LFG Project. <br /> 44 <br /> (00018638.DOC 21) <br />