Orange County NC Website
48 <br /> 129. Flare Payment Date: The University shall commence Flare Payments to the <br /> County thirty (30) days after the acceptance of the completed LFG Collection System by the <br /> North Carolina State Construction Office. <br /> 130. LFG Project Date: The University shall commence construction of the Pipeline <br /> and the Gas Conversion System after the occurrence of the following - Q i ts: <br /> a. The receipt of all necessary Approvals to construc - Pipeline. <br /> b. The receipt of all necessary LFG Project P- _ ". re • the Gas Conversion <br /> System and the Pipeline. <br /> Within ten(10) days of its receipt of the last Approval necessary to construct the Conversion <br /> System and the Pipeline, the Party receiving such Approval shall notify the other Party in <br /> accordance with Paragraph 153 hereunde E -.• - of the issuance of such Approval. <br /> 131. -Conversion Payment Dat= The k _ shall commence Conversion <br /> Payments to the County thirty (30) days after _:- acceptan«- of the completed Gas Conversion <br /> System by the North Carolina State Construction •: ;; . <br /> ARTICLE IX <br /> LANDFILL GAS DELIVERY <br /> 1 Ownership • ��;�_.'i tie of the Landfill Gas shall pass to the University at the Delivery <br /> Point. <br /> 133. For p• '`= of measuring the quantity of Landfill Gas delivered to the Delivery <br /> Point, the University shall install, at its own cost and expense, Gas Flow Meters for Meter Point <br /> A and Meter Point B with a design accuracy of not less than two percent(2%) for all parameters <br /> measured and taking into account verification methodologies for Environmental Benefits. <br /> 43 <br /> (00018638-DOC 21) <br />