Browse
Search
Agenda - 02-03-2009 - 6b
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2009
>
Agenda - 02-03-2009
>
Agenda - 02-03-2009 - 6b
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2016 10:50:10 AM
Creation date
1/30/2009 3:34:02 PM
Metadata
Fields
Template:
BOCC
Date
2/3/2009
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
6b
Document Relationships
Minutes - 20090203
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
26 <br /> compliance with the LFG Project Permits and all applicable Laws and in accordance with good <br /> engineering practices and industry standards. <br /> 81. Except as set forth in Paragraphs 57 and 58 of this Agreement, the University <br /> shall be solely responsible for securing any and all Approvals, including, without limitation, <br /> preparing all permit documentation for any Landfill or LFG Project Permits on which the County <br /> will be the permittee. Exhibit D contains a preliminary, but not exhaustive, list of Approvals <br /> that the University believes it must obtain to install, construct, operate, maintain, and repair the <br /> LFG Project. The University shall, at its own e E $ ..ply for and seek to obtain all <br /> Approvals, including those listed on Exhibit D $1 t ey are 7,3t required for the LFG Project. <br /> The University will apply for any such Approval as the • z 5`_ and operator of the LFG Project, <br /> r1,, <br /> and shall act as the "permittee," "owner" "operator"operator» for s I : A oject as may be appropriate <br /> under applicable Laws. <br /> 82. The Univ -s that it is in the Parties' mutual best economic interest <br /> for the LFG Prole, - coin expeditiously. Without limiting the generality of the <br /> University's obligations un. • 4 0,, • Bement, beginning on the Effective Date, the <br /> University shall work expeditio i d in good faith to (a)complete the LFG Collection System <br /> • <br /> within eighteen (18) months from i date of the issuance of the last Approval necessary to <br /> construct such system, and (b) complete the Gas Conversion System within thirty-four (34) <br /> months from the date of the issuance of the last Approval necessary to construct the Gas <br /> Conversion System and the Pipeline. If the University fails to complete the LFG Project within <br /> five (5) years of the date of the issuance of the last Approval necessary to construct the LFG <br /> Project,the County shall have the right to terminate the Agreement pursuant to Article VI. If the <br /> Engine Start-up Date does not occur within thirty-five (35) months after the date of the issuance <br /> 21 <br /> (000111638.DOC 21) <br />
The URL can be used to link to this page
Your browser does not support the video tag.