Browse
Search
Agenda - 02-03-2009 - 6b
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2009
>
Agenda - 02-03-2009
>
Agenda - 02-03-2009 - 6b
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2016 10:50:10 AM
Creation date
1/30/2009 3:34:02 PM
Metadata
Fields
Template:
BOCC
Date
2/3/2009
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
6b
Document Relationships
Minutes - 20090203
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
25 <br /> assignments of rights, and other documents as may be necessary to allow the University perform <br /> its obligations under this Agreement <br /> 76. The County shall make available to the University copies of all environmental <br /> information, reports, studies, landfill gas feasibility reports, assessments or other documents <br /> a f f e c t i n g t h e g e n e r a t i o n of Landfill Gas or t h e LFG P r o j e c t t h a t t h e C. ity has prepared or that <br /> have been prepared on the County's behalf. Such documen clude those the County is <br /> required to submit to the North Carolina Department of En ;. ent ° atural Resources. <br /> 77. The County shall reasonably ensure that the County, employees and <br /> contractors do not damage the LFG Project or disrupt the operation of the syste l . I ould such <br /> damage occur, the University has the right to take immediate action to effectuate whatever <br /> repairs are necessary to bring the LFG ;. "i to fully operational condition and the County <br /> shall timely reimburse the University for the -. o. • r C of of repair. <br /> 78. The County shall retain the sole exclusiv, ght, and shall have all obligations <br /> with regard to Landfill operations and for m- _;� all applicable Laws pertaining to such <br /> operation, excl ' e of the University's operation o the LFG Project. <br /> P O i era 'rotocols <br /> The Parties gee to develop and implement operating protocols for the LFG <br /> Collection ,1 incl • �w:, without limitation, monitoring and reporting procedures, <br /> communications an s cy response plans, and notification procedures. <br /> ARTICLE III <br /> PERMITTING AND CONSTRUCTION OF FACILITIES <br /> 80. The installation and construction of the LFG Project shall be the sole <br /> responsibility and be undertaken at the sole expense of the University, and shall be carried out in <br /> 20 <br /> (00018638.DOC 21) <br />
The URL can be used to link to this page
Your browser does not support the video tag.