Browse
Search
Agenda - 02-03-2009 - 6b
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2009
>
Agenda - 02-03-2009
>
Agenda - 02-03-2009 - 6b
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2016 10:50:10 AM
Creation date
1/30/2009 3:34:02 PM
Metadata
Fields
Template:
BOCC
Date
2/3/2009
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
6b
Document Relationships
Minutes - 20090203
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
21 <br /> fifteen (15) calendar days to complete the final review and approval of such revised plans and <br /> specifications prepared by the University. Any revised plans and specifications for which the <br /> County has not provided a response within fifteen(15) calendar days shall be deemed approved. <br /> Should subsequent changes or modifications be made to the-plans and specifications after they <br /> have been approved, the County shall then have seven (7) days to review and approve such <br /> changes or modifications. Any subsequently revised plans and specifications for which the <br /> County has not provided a response within seven (7) days shall be deemed approved. Within a <br /> reasonable time after completing construction of the LFG Collection System, but no longer than <br /> sixty (60) days, the University shall provide to the County all "as-built"plans and specifications <br /> for the LFG Collection System. Until the "as-built" plans and specifications for the LFG <br /> Collection System are provided to the C. , e University shall keep the County informed as <br /> to the state of the construction of the L Co 1 E f ,F stem and the location of all then- <br /> installed components of such system. <br /> 64. The University, its employees, ` : ts and subcontractors shall minimize <br /> disruption to L, , 111 operations during construe I on, operation, and maintenance of the LFG <br /> Project "0 uring .u of this Agreement, the University, its employees, agents and <br /> subconm shall note onably interfere with the County's operation of the Landfill, <br /> including, bu` limited t•, e County's closure of portions of the Landfill and any other <br /> requirements under" f . i i Permits or applicable Laws, and shall reasonably ensure that the <br /> Landfill is not dams ed by the University. Should such damage occur, the University shall <br /> arrange for the repairs itself; provided, however, that the County has the right to take immediate <br /> action to effectuate whatever repairs are necessary to the Landfill and the University shall timely <br /> reimburse the County for the reasonable costs of any such repairs. The University shall use its <br /> 16 <br /> {00018638.DOC 21) <br />
The URL can be used to link to this page
Your browser does not support the video tag.