Browse
Search
Agenda - 02-03-2009 - 6b
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2009
>
Agenda - 02-03-2009
>
Agenda - 02-03-2009 - 6b
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2016 10:50:10 AM
Creation date
1/30/2009 3:34:02 PM
Metadata
Fields
Template:
BOCC
Date
2/3/2009
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
6b
Document Relationships
Minutes - 20090203
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
20 <br /> (i) in compliance with all LFG Project Permits and applicable Laws and (ii) in accordance with <br /> good engineering practices and industry standards. The University assumes the risk of the <br /> delivery conditions (including the rate of flow, vacuum and pressure of delivery), quantity and <br /> quality of LFG. <br /> 61. The University is solely responsible for creating sufficient vacuum to extract LFG <br /> from Landfill and transfer it to the Delivery Point. Any such vacuum shall not adversely affect <br /> the County's Landfill operations, and the University shall adjust its operations of the LFG <br /> Project or install necessary equipment at its sole coy d e •erase to correct any such adverse <br /> effect. Should such adverse effects arise • �nr nivers is unable to correct through <br /> operational adjustments, the University shall, at the .' . r u Manager's written request, take <br /> commercially reasonable steps to promptly suspend the LFG ►} ..tio$ pending the correction <br /> of the conditions causing such adverse effects. <br /> 62. The Univ-.sm make commercially reasonable efforts to cooperate with the <br /> County in the prep and filing of any applications or other documents as may <br /> be necessary to perform the ‘ E�� - • »der this Agreement <br /> 63. The University s•. I� - bmit for the County's prior approval (which shall not be <br /> unreasonably withheld), all permit d• «. ••entation prepared in accordance with Paragraph 81 and <br /> all construction and design plans and specifications relating to the construction, operation, and <br /> maintenance of the LFG Collection System prior to commencing construction. The County shall <br /> have fifteen (15) calendar days to complete its review and approval of any such plans and <br /> specifications. Any plans and specifications for which the County has not provided a response <br /> within fifteen (15) calendar days shall be deemed approved. Should the County provide <br /> comments on the initial submission of any submitted plans and specifications, it shall then have <br /> 15 <br /> {00018638.DOC 21} <br />
The URL can be used to link to this page
Your browser does not support the video tag.