Browse
Search
Agenda - 02-03-2009 - 6b
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2009
>
Agenda - 02-03-2009
>
Agenda - 02-03-2009 - 6b
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2016 10:50:10 AM
Creation date
1/30/2009 3:34:02 PM
Metadata
Fields
Template:
BOCC
Date
2/3/2009
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
6b
Document Relationships
Minutes - 20090203
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
113 <br /> parameters measured and taking into account verification methodologies for Environmental <br /> Benefits. <br /> 111 13s5-Such Gas Flow Meters shall be owned,operated,maintained and calibrated by <br /> the University at its sole cost and expense. The Gas Flow Meters shall be designed and operated to <br /> provide time-synchronized data for MMBtu and to provide all other information required to be <br /> measured pursuant to this Agreement The University's Gas Flow Meters shall be sealed,with the <br /> seals broken only for the purpose of inspecting, testing, repairing, or recalibrating the metering <br /> devices. The University shall keep its Gas Flow Meters accurate and in good working order and <br /> the University shall periodically test such metering equipment as the University deems necessary; <br /> provided that the University shall test its metering equipment at least once every six(6)months, <br /> but in no case less than any testing requirement set forth in any applicable Laws or manufacturers' <br /> recommendations. In the event a Gas Flow Meters is to be tested,cleaned,repaired or recalibrated, <br /> or otherwise read or inspected by the University,the University shall provide the County with five <br /> (5)days prior written notice of any such procedure, so that the County may be present during any <br /> such procedure. The University shall preserve all charts, test data and similar records in <br /> accordance with the record retention provisions of Paragraph X491 8 of this Agreement. The <br /> County shall have the right to install and maintain its own Gas Flow Meters. <br /> 135. -The County and its agents shall have the right from time to time,at reasonable <br /> times during the Term, to monitor, access, and inspect the condition and use of the LFG Project <br /> and to monitor, access, and inspect work in progress and the day-to-day operation of the LFG <br /> Project Any such monitoring, examinations, inspections or visits shall be conducted in a manner <br /> -so as to cause minimum interference with the University's LFG Project <br /> {00022477.DOC} <br />
The URL can be used to link to this page
Your browser does not support the video tag.