Browse
Search
Agenda - 01-22-2009 - 4p
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2009
>
Agenda - 01-22-2009
>
Agenda - 01-22-2009 - 4p
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2016 3:07:21 PM
Creation date
1/21/2009 10:31:54 AM
Metadata
Fields
Template:
BOCC
Date
1/22/2009
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
4p
Document Relationships
2009-012 Coop Ext - Tobacco Trust Fund & Golden Leaf Foundation for Value Added Center
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2009
Minutes - 20090122
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2009
S Grant - Co Ext - Golden Leaf Grant for Piedmont Value Added Shared Use Food & Agricultural Processing center 01-22-2009-4p
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\BOCC Grants\2000 - 2009\2009\2009 Grants
S Grant Agreement NC Tobacco Trust Fund commission and Orange Co 01-22-09-4p
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\BOCC Grants\2000 - 2009\2009\2009 Grants
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
39 <br /> Piedmont Value-Added Shared-Use Food and Agricultural Processing Center Revised Budget <br /> Narrative <br /> Renovation activities are necessary for preparing the designated facility for installation of equipment. <br /> Category/Item Budget Explanation <br /> Professional engineering services are required to ensure that <br /> renovations are certain to enable complete installation of <br /> Engineering Services processing equipment <br /> The facility must be retrofitted for water supply and <br /> wastewater. These activities must be completed in a manner <br /> that ensures successful permitting of the facility for food <br /> Plumbing-Drains&Supply processing <br /> Floors of the facility must be modified to ensure that most <br /> areas of the facility can be cleaned regularly and allow <br /> Floor tiling and sloping wastewater to be evacuated from the food preparation areas <br /> Electrical fixtures are required to modified for a food <br /> processing facility. Specific equipment outlets will be installed <br /> Electrical to ensure timely installation of processing equipment <br /> Acoustical Ceilings Installation of specialized ceiling surfaces needed to <br /> HVAC extension is needed for retrofitting of facility into <br /> HVAC Extension separate areas to serve specialized processing equipment <br /> Painting Required for obtaining the necessary food processing permits <br /> Circulating Hot Water Heater Required for obtaining the necessary food processing permits <br /> Doors and hardware are needed for retrofitting of facility into <br /> Doors&Hardware separate areas to serve specialized processing equipment <br /> Fire sprinkler extension is needed for retrofitting of facility into <br /> Fire Sprinkler Extension separate areas to serve specialized processing equipment <br /> FRP board is needed for retrofitting of facility into separate <br /> FRP Board areas to serve specialized processing equipment <br /> Fire alarm extension is needed for obtaining the necessary <br /> Fire Alarm System Extension occupancy permits <br /> Sink Hand Wash x 6 Required for obtaining the necessary food processing permits <br /> Fire extinguishers are required for obtaining the necessary <br /> Fire Extinguishers occupancy permits <br /> BOCC Meeting, January 22, 2009, Page 39/39 <br />
The URL can be used to link to this page
Your browser does not support the video tag.