Orange County NC Website
15 <br /> Piedmont Value-Added Shared-Use Food and Agricultural Processing Center <br /> Section H:Project and Applicant Description <br /> 2. Project Budget(cont'd) <br /> b. Detailed Budget-Tobacco Trust Fund Request <br /> Category/Item Cost <br /> Equipment <br /> Vegetable?olisher(potato/can•ot),roller type,conveyor feed $ 45,000 <br /> Size reduction equipment(Urschel) $ 24,000 <br /> Hard Vegetable Wash Line $ 20,000 <br /> Filler,auger type&weigh pack $ 29,500 <br /> Pulper,Langsenkamp type $ 20,000 <br /> Conveyor,Accumulator&Scrambler tables-filling line $ 12,500 <br /> Food pump and stainless pipefittings(Waukesha type) $ 8,000 <br /> Pulper/Stever,Robo-Coupe type $ 6,000 <br /> Continuous Blancher $ 7,500 <br /> Dough sheeter&divider;proof cabinet $ 13,500 <br /> Double deck oven,gas;Braising Pan;Fryer $ 12,000 <br /> Smoker,Convection type $ 10,000 <br /> Commercial Meat Grinder $ 3,000 <br /> Meat bandsaw $ 1,500 <br /> Commercial sausage filler $ 1,500 <br /> Blast Freezer 10 X 16 $ 24,000 <br /> Steam generator-20-30 hp.&Kettle $ 15,000 <br /> Vacuum Sealer-double chamber-w/map capability $ 8,000 <br /> Box taping machine,Shrink Tunnel $ 7,300 <br /> Mixer-60 qt.with bowl dollies, $ 6,000 <br /> Cooler-2 door reach in;ice machine 3 ton per day $ 15,000 <br /> Security cameras w/monitor per system $ 5,000 <br /> 255 Batch Code printer,excluding computer $ 5,000 <br /> Mixer 20 qt.,stainless bowl $ 4,000 <br /> Griddle;Microwave;Dehydrator $ 3,900 <br /> Vegetable,olisher(potato/carrot),roller type,conveyor feed $ 3,100 <br /> Size reduction equipment(Urschel) $ 135 <br /> Equipment shipping and installation $ 46,565 <br /> Equipment Subtotal $ 357,000 <br /> Personnel <br /> Executive Director,salary+benefits $ 60,000 <br /> Personnel Subtotal $ 60,000 <br /> Operations <br /> Legal&Accounting $ 2,300 <br /> Office Supplies $ 1,500 <br /> Cleaning Supplies/Waste Management $ 4,000 <br /> Marketing $ 5,000 <br /> Equipment Maintenance,Parts&Labor $ 10,000 <br /> Staff Travel $ 1,000 <br /> Insurance $ 4,000 <br /> Building Maintenance&Utilities;Telephone $ 34,200 <br /> Operations Subtotal $ 62,000 <br /> TOTAL REQUEST $ 479,000 <br /> 5 <br /> BOCC Meeting, January 22, 2009, Page 15/39 <br />