Orange County NC Website
. ~ -~ ~ ~~~:2387 l ~: 337 <br />qualified residents of the community in the area of the quarry by considering these residents <br />before others for job openings that occur during the time American Stone operates the <br />• quarry. <br />• 35. OWASA shall name the reservoir that results from the expansion of the quarry after the <br />community in which it is located. <br />36. American Stone Company shall sponsor an annual neighbor day for residents living .within <br />a 3,000-foot radius of the perimeter of the property encumbered by this special use permit <br />for the purpose of maintaining constructive communicat~ns with the neighbors and to offer <br />a planned forum in which neighbors might ask questions about American Stone Company's <br />operation. <br />37. OWASA shall provide a special forum for citizens who live in the area of the quarry to <br />speak with the OWASA Board of Directors about their concerns. <br />38. Operations associated with the extraction of earth materials and the reclamation of the <br />property at the conclusion of mining will be in conformance with the standards set out in <br />Section 8.8.1.2 of the Ordinance as it presently exists, Mining Permit # 68-02 as modified <br />and the approved Reclamation Plan filed in accordance with Mining Permit #68-02. In the <br />event of any inconsistency between the Ordinance and the Mining Permit, the stricter <br />requirements shall control. <br />39. A security fence of at least 6' in height shall be installed around the entire circumference of <br />the pt and plant area. <br />40. Berms consisting of spoil and by products from operations shall be located as shown on the <br />. approved site plan and shall not reach a height greater than 40' above the original contour <br />and shall not be graded so that the vertical slope exceeds the material's natural angle of <br />repose. <br />41. Applicants shall submit operational reports to the County Manager, or designee, on an <br />annual basis detailing the amounts of materials extracted, extent of extractive area, depth of <br />extractive area and ground water test boring to the County. <br />42. The petition to close existing Bethel Hickory Grove Church Road (SR 1104) shall not be <br />considered until the relocation and construction of the new SR 1104 is complete and <br />accepted by NCDOT. <br />43. Prior to submittal of the Bethel Hickory Grove Church Road (SR 1104) construction <br />drawings to NCDOT, the Orange County Erosion Control shall review and approve an <br />erosion control plan. <br />44. A 100 feet Type F buffer shall be retained/installed around the entire perimeter of the <br />petitioned site. <br />• 45. The travel width pavement of the relocated Bethel Hickory Grove Church Road (SR 1104) <br />shall be a minimum of 24 feet.- In addition, on each side of the entire length of the road, a- <br />foot, paved bicycle lanes shall be built in accordance with NCDOT specifications. <br />• 46. The ultimate ri ht-of-wa cross-section for NC 54 shall be 100 feet at its intersection w' <br />g Y ith <br />relocated SR 1104. If the right-of--way is less than 100 feet, a dedication, in fee simple, of <br />44 <br />