Browse
Search
P-0395 - No Fault Well Repair Fund Policy 06-04-2002-9a
OrangeCountyNC
>
BOCC Archives
>
Policies
>
P-0395 - No Fault Well Repair Fund Policy 06-04-2002-9a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2009 4:42:04 PM
Creation date
1/15/2009 12:46:39 PM
Metadata
Fields
Template:
BOCC
Date
6/4/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />Memo <br />r« John M. Link, Jr., County Manager <br />Board of County Commissioners <br />Front Craig N. Benedict, AICP, Planning Director <br />~ae~ Thursday, May 30, 2002 <br />R« American Stone Company <br />The American Stone Company (ASC) and OWASA have a Speaal Use <br />Permit (SUP) that regulates the operation of the quarry. The SUP is a recorded <br />(October 10, 2001,) document that was adopted by the Board of County <br />Commissioners after twelve (12) years of project review and mediation, which sets <br />forth fifty-one (51) conditions related to the quany/reservoir project. <br />The attached brochure from the Empowerment Project notes some of the <br />conditions (which are cross-referenced to the actual SUP) by the numbers adjacent <br />to the brochure boxes. The subject brochure reasonably abridges the actual text of <br />the specific germane sections of the SUP which is attached. <br />On April 5, 2002, Orange County Planning & Inspection's staff wrote a letter <br />(see attached) to Chris Rivera of the Empowerment Project, offering to meet with the <br />community (and American Stone Company (ASC) or OWASA if necessary) to <br />discuss implementation and specific party responsibilities of the SUP. <br />34 - - <br />Attachment 1 -Empowerment Project Brochure <br />Attachment 2 -Sections of the SUP <br />• Attachment 3 - 45-02 Planning & Inspections letter to Empowerment Project <br />• G~sie~Msc4053002MLGtoJLrAmaSto~ce <br />
The URL can be used to link to this page
Your browser does not support the video tag.