Browse
Search
P-0395 - No Fault Well Repair Fund Policy 06-04-2002-9a
OrangeCountyNC
>
BOCC Archives
>
Policies
>
P-0395 - No Fault Well Repair Fund Policy 06-04-2002-9a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2009 4:42:04 PM
Creation date
1/15/2009 12:46:39 PM
Metadata
Fields
Template:
BOCC
Date
6/4/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ii <br />PROCESS AND TIME GUIDELINES <br />NO FAULT WELL REPAIR FUND REQUESTS <br />AMERICAN STONE COMPANY QUARRY AREA <br />A. Problems related to water quantity <br /> Process Steps Response Time Guidelines <br />i. Request is received by Environmental Health Division (OCHD) N/A <br /> from residents or other a enc . <br />ii. OCHD contacts American Stone and advises them of the Contact made within 2 business <br /> re uest and the nature of the re uest. da s of re uest. <br />iii. American Stone consultant visits site, conducts a preliminary <br /> investigation, and determines whether a well problem exists and Consultant visits site within 10 <br /> if the problem is a "probable result" of the quarry activity. The business days of request. <br /> consultant re orts findin s to OCHD. <br />iv. If the consultant finds that the problems area "probable result" N/A <br /> of the o eration, no further action is necess b OCHD <br />v. Based on a finding and report from American Stone that there is OCHD confirms or denies the <br /> a well problem and it is not a probable result of the quarry well failure claim within 5 <br /> operation, OCHD staff will: business days of receipt of the <br /> a. Confirm a well failure exists; or American Stone consultant report <br /> b. Deny the well failure claim; or or recommends further study of <br /> c. Recommend further stud of the well the well. <br />vi. For well failures that are not a probable result of the quarry <br /> operation, OCHD staff recommends: Strategy recommended and <br /> a. A remediation strategy - an authorized Orange County contractor is contacted within 10 <br /> representative contacts the appropriate contractor(s). (Go to business days of receipt of final <br /> step viii); or sample results or after results of <br /> b. Further study by a private consultant to determine the best further study are complete. <br /> remediation strate <br />vii. Private consultant completes study and reports to OCHD (go Depends on consultant schedule <br /> back to vi-a. <br />viii. Remediation strategy is effected Depends on contractor schedule <br /> Appeals shall be made within 30 <br /> days of the issuance of a denial <br /> based on the finding that no well <br />ix. Appeals by the residents to the Board of Health failure exists or other finding <br /> unsatisfactory to the resident. <br /> Once made, appeals progress <br /> according to the Board of Health <br /> Polic on a eals. <br /> <br /> <br /> <br />• <br />C <br />
The URL can be used to link to this page
Your browser does not support the video tag.