Browse
Search
P-0270 - Water-Sewer Extensions Outside of Approved Service Areas 08-18-1987-8
OrangeCountyNC
>
BOCC Archives
>
Policies
>
P-0270 - Water-Sewer Extensions Outside of Approved Service Areas 08-18-1987-8
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2009 10:18:02 AM
Creation date
1/15/2009 10:18:00 AM
Metadata
Fields
Template:
BOCC
Date
8/18/1987
Meeting Type
Regular Meeting
Agenda Item
8
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />IhTEROFFIC~ !°'=`MORANDUM; 8701-1810 <br />• h'eterlSe.er Fol icy 26~I <br />May t3, 1957 <br />Page 7 <br />for six years equEls maximum County <br />funding <br />For approved protects, Orr•nge Courty shall pay aft <br />costs up to the 1lmlts s-t-ed above at no cost to~ <br />the developer except in *he case of a lease <br />agreement. in such cases, -he terms of the lease <br />shall include recovery of ell County costs plus <br />Interest within six years 2fter utilities are <br />turned on. (hSP) <br />(6) It shall be the policy c; Orange County to have <br />title to any hater and =Ewer utilities .rhlch it <br />funds. (h'Sf') <br />(7) A fee schedule for tap-one .•ill be developed. Mhere <br />properties along a Co;.r,-y-o-+ned portion of a <br />u'llity extension wish to `e^-oa to the ut111ty, an <br />zssessment fee shall 5e c~~:.roed in addition to a <br />tap--on fee. The assessment `. re shall be determined <br />by the Board of Commisslone-s tnd bleed on acreage <br />and/or front footage serve. <br />The owner of a <br />• farm may select <br />cr her house, to <br />be applied. If <br />th8 f0rmuf8 kil <br />remainder of the <br />large <br />one <br />which <br />later <br />be <br />tr8G+ <br />acreage tract or bons fide <br />acre, uspally surrounding h;s <br />yhe assessment formula will <br />the nraperty is subdivided, <br />app:'ed end charc4d for the <br />. (tti'J?) <br />($) It shat I be Orange Cpur.ty ~+ol i;,y to require that <br />when a County-financed were- or sewer extension is <br />connected to a municipal!}~-ow•ne: and operated water <br />or sewer system, then the r..uni,ipslity sha{I enter <br />into an agreement with the ~oun-y providing that in <br />the event the project se-wed is annexed by th® <br />m~niclpality, i': shell pay -o `:~e County any County <br />share of the project n;,t recoveret by the <br />development. (K'SP) • <br />(9) It shall. ba the policy of ^~rarQe County to require <br />that xater end sewer utilities will 5e ~uttt to the <br />standards and spec i f i cat i o^5 ~af y'r.e mur. is i pal ity, <br />privLte essocia'~ion or we'~er o^ sewer authority to <br />whose system tfiey are connected. (K'S?) <br />(10) hater and sewer utilities e::tenced to a development <br />under this policy shall be cf such resign and size <br />to serve not only thLt iGve!~pmer.t but also any <br />existing or anticipttec de~•elopment ~•ithin the area <br />of the development._ The rvdi~:onal czpacity to be <br />installed a•~ The time c~ y^e extension to a <br />r~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.